www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > How to ensure the safe use of steel structure?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

How to ensure the safe use of steel structure?

Time:[2021-10-13]  Hits:2297

How to ensure the safe use of steel structure?

With the rapid development of factory buildings in China, steel structures are more and more widely used. As we all know, the application of steel structure in plant construction is very important. Therefore, the following problems must be paid attention to when storing and installing steel structures to ensure the safe use of steel structures.

1. The specification, steel number, quantity and material acceptance certificate number of the steel shall be indicated at the end of the steel.

2. When stacking in the open air, the site shall be flat, the height shall be higher than the surrounding ground, and there shall be drainage channels around.

3. During stacking, the back of the steel section shall be upward or outward as far as possible to avoid the accumulation of snow and water. There shall be a height difference between the two ends to facilitate drainage.

4. Before installation, the construction unit shall conduct special inspection on the product certificates, design documents and pre assembly records of parts, and recheck the dimensions of parts.

5. Appropriate connection mode shall be adopted for steel structure to make the node design consistent with the simplified structural calculation model.

6. When hoisting the steel structure, appropriate measures shall be taken to prevent excessive bending and torsional deformation, and washers shall be added to the contact part between the wire rope buckle and the member to prevent the member from being injured.

7. When the steel structure is in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

8. High altitude operators shall use tools, and spare parts shall be placed in the tool bag rather than thrown up and down

9. When working in rainy days, reliable anti-skid measures must be taken, and pay attention to lightning protection in thunderstorm season.

10. The weather conditions before construction are also optimistic, and it is forbidden to use winds of level 4 or above.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 色91 | 古代三级在线大全视频 | 一级特级女人18毛片免费视频 | 一级免费a | 天堂色网 | 深夜福利网站在线 | 一级做a爰片欧美一区 | 特级做a爰片毛片免费看一区 | 婷婷丁香花 | 美女色网 | 永久在线 | 中文字幕一区二区三区免费视频 | 美女紧身裤裆看光了下面 | 高清视频完整版在线观看 | 日本中文在线播放 | 三级做爰蜜桃成熟时33d | 天天干天天碰 | 久久精品视频免费观看 | 亚洲欧美激情在线 | 高清一区二区三区视频 | 亚洲综合色丁香婷婷六月图片 | 欧美视频在线免费 | 亚洲精品在线看 | 99香蕉精品视频在线观看 | 538prom国产在线视频一区 | 欧美怡红院高清在线 | 虐奶小说 | 欧美一区二区三区成人看不卡 | 久久久国产在线 | 色妞精品一区二区 | 亚洲天堂毛片 | 中文字幕欧美成人免费 | 女尊高h | 日韩欧美高清在线观看 | 亚洲一区二区成人 | 色香欲亚洲天天综合网 | 在线天天干 | 乱鬼龙在线 | 久久亚洲国产午夜精品理论片 | 俄罗斯xxxxxbbbbbb极品 | 手机看片国产欧美日韩高清 |