www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Steel structure warehouse hoisting process and hoisting plan-Chapter 1
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:2848

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 在线视频1卡二卡三卡 | 中国女人性姣配 | 全部免费特黄特色大片视频 | 伊人影院久久 | 一二三四免费观看在线8 | 人人想人人人爽人人叫 | 亚洲欧美v国产一区二区 | 日韩精品在线视频观看 | 在线色av| 欧美a级片视频 | 曰本黄页 | 蒙嘉慧三级 | 白丝爆漫画羞羞动漫 | 密色影院 | 日本免费一区二区三区视频 | 五月婷综合网 | 自拍视频在线 | 性性欧美 | 最近最中文字幕视频 | 成人午夜私人影院入口 | 日韩精品中文字幕一区三区 | 色综合久久综合欧美综合图片 | 免费看特黄特黄欧美大片 | 欧美一级视 | 2020天堂中文字幕一区在线观 | 日韩爱爱网 | 乱人伦视频中文字幕免费 | 成人在免费观看视频国产 | 五月婷婷深爱五月 | 人人看人人做 | 女人扒开腿让男生桶爽动漫 | 日本三级2018亚洲视频 | 宇都宫紫苑日韩专区亚洲 | 日韩欧美一二区 | 欧美一级看片 | 深爱婷婷激情网 | 亚洲婷婷影院 | 四虎在线永久免费观看 | 欧美性稚交6-12 | 午夜欧美成人久久久久久 | 亚洲入口 |