Installation details that must be paid attention to in steel structure processing

Time:[2021-9-22]  Hits:2433

Installation details that must be paid attention to in steel structure processing

In the construction of steel structure engineering, there are many details to pay attention to, especially in the installation process. We need to carefully operate and inspect the steel structure before, during and after installation.

1. Before the installation of steel structure processing members, the quality of steel members shall be checked. In case of deformation and defects, the steel members shall be measured and corrected according to the engineering characteristics within the range of allowable deviation. For the welding of thick steel plate and dissimilar steel plate and the main process of high-strength bolt installation, the process test shall be carried out before installation, and the corresponding key points of construction process shall be prepared.

2. When the expanded assembly unit is used for installation, the strength and stability of steel members that are easy to deform shall be checked, and reinforcement measures shall be taken when necessary; During the comprehensive installation of steel members, it shall be divided into several independent units. After the installation of all steel members of each unit, a spatial stiffness unit shall be formed.

3. During steel structure processing, the columns, beams, roof trusses, supports and other main components of steel members shall be corrected and fixed immediately after they are installed in place. The steel members installed on the same day form a stable space system. During the installation and correction of steel structure, corresponding adjustment measures shall be taken according to the influence of external environment such as wind force, temperature difference and sunshine and welding deformation.

4. When using the installed steel structure to hoist other components and equipment, the consent of the design unit shall be obtained, the checking calculation shall be carried out, and corresponding measures shall be taken.

5. During steel structure processing, 70% of the contact surfaces of the nodes tightened according to the design requirements shall be close to each other. Check with a 0.3mm thick feeler gauge, and the sum of the insertable areas shall not be greater than 30% of the total contact jacking area; The edge clearance shall not exceed 0.8mm.

6. When installing high-strength bolts, the bolts shall freely penetrate into the holes and shall not be used as temporary installation bolts. At the same time, the installation of high-strength bolts shall be tightened in sequence, and shall be tightened outward in the order of the center of the bolt group, and the final tightening shall be completed on the same day.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 在线日本韩国 | 男女一级做a爱过程免费视频 | 色噜噜狠狠一区二区 | 骚碰97 | 日韩免费一级 | 欧美另类久久久精品 | 日本一卡2卡3卡无卡免费 | 美女被羞羞产奶动漫 | 日本一区二区三区欧美在线观看 | 欧美一区日韩一区中文字幕页 | 日韩精品a在线视频 | 污在线观看视频 | 日本系列第一页 | 搞逼视频网站 | 中文字幕第二区 | 1级a的观看视频 | 最近新韩国日本免费看 | 日韩三级小视频 | 日韩一级在线播放 | 亚洲va中文字幕无码 | 在线免费观看网址 | 日本在线免费看片 | 日本黄色免费网址 | 俄罗斯美女与禽交zoz0 | swag麻豆| 日韩欧美高清视频 | 欧美日韩国产58香蕉在线视频 | 色婷婷精品综合久久狠狠 | 天天影视色香欲综合网天天录日日录 | 美女视频黄频a免费高清不卡软件 | 青青青青手机在线视频观看国产 | 99精品欧美一区 | 色综合久久精品中文字幕 | 天天干天天干天天色 | 情侣国产在线 | 久久精品人人爽人人爽快 | 啊好大好爽视频 | 欧美精品在线免费 | 青春草在线观看播放免费视频 | 欧美热妇| 中国女人一级做受免费视频 |