www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2769

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 色多多视频在线观看免费完整版 | 三级在线观看免播放网站 | babesvideos性欧美老师 | 日韩精品一区二区三区在线观看 | 一级做a爰片久久毛片看看 一级做a爰片久久毛片16 | 日韩美视频网站 | 欧美一区二区三区精品影视 | 日本99视频 | 亚洲福利一区二区精品秒拍 | 伊人色综合久久天天人手人停 | 欧美一级片网站 | 天堂网站天堂小说 | 中文字幕成人免费视频 | 日本美女一级视频 | 久久这里有精品 | 天天综合天天看夜夜添狠狠玩 | 在线观看成人免费视频 | 一级毛片全部免费播放 | 车车好快的车车污网站rh | 天天天天添天天拍天天谢 | 欧美无专区 | 在线国产片| 欧美无删减 | 一级做受视频免费是看美女 | 色吊丝性永久免费看码 | 手机看片高清日韩精品 | 12至16末成年毛片视频 | 97色伦图片在线观看 | 日本成人网址 | 久久这里只有免费精品6www | 天天做天天爱夜夜爽 | 色戒梁朝伟做爰被删减的视频 | 午夜视频免费 成人 | 青春草在线免费观看 | 在线一级 | 人人草人人爽 | 热伊人99re久久精品最新地 | 中文字幕欧美视频 | 四虎影院国产精品 | 欧洲成人爽视频在线观看 | avwww在线|