www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > How should the reinforcement of steel structure warehouse be designed?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

How should the reinforcement of steel structure warehouse be designed?

Time:[2021-8-23]  Hits:2941

Reinforcement design principles

 

1. When the reliability appraisal confirms that the steel structure needs to be reinforced, the reinforcement design shall be carried out in accordance with the standards and regulations based on the appraisal conclusion and the requirements put forward by the property owner. The scope of the reinforcement design can be determined according to the entire building or an independent section of it, or according to the designated structure, component or connection, but the overall stability of the structure should be considered.

 

 

2. The safety level of the reinforced steel structure shall be determined by the property owner and the designer in accordance with the actual situation in accordance with the severity of the structural damage, the importance of the structure and the service life of the reinforcement design.

 

 

3. The reinforcement design of the steel structure warehouse should be closely integrated with the actual construction methods, and effective measures should be taken to ensure that the new components and components are reliably connected to the original structure, and the new section and the original section are firmly combined to form an overall joint work; Unreinforced parts, as well as related structures, components, and foundations cause adverse effects.

 

 

4. For damage to the original structure caused by factors such as high temperature, high humidity, low temperature, freezing and thawing, chemical corrosion, vibration, temperature stress, shrinkage stress, uneven foundation settlement, etc., effective prevention and control measures should be proposed in the reinforcement design, and should Governance and reinforcement shall be carried out in the order specified by the design.

 

5. The reinforcement design of steel structure warehouses should comprehensively consider its technical and economic effects, and should not reinforce structures with poor repairability, and should not lead to unnecessary dismantling or replacement.

 

6. For steel structures that may be inclined, unstable, excessively deformed or collapsed during the reinforcement process, effective temporary safety measures shall be proposed in the reinforcement design documents.

 

Reinforcement method and coordinated use technology

 

1. The reinforcement of steel structure warehouses can be divided into two types: direct reinforcement and indirect reinforcement. When designing, suitable reinforcement methods and technologies can be selected according to actual conditions and use requirements.

 

 

2. Direct reinforcement should be selected according to the actual situation of the project to increase the section reinforcement method, stick steel plate reinforcement method and combined reinforcement method.

 

 

3. Indirect reinforcement should be adopted to change the structural system reinforcement method and the pre-stressed reinforcement method according to the actual situation of the project.

 

4. The connection method for steel structure reinforcement should adopt welding seam connection and friction type high-strength bolt connection; it can also adopt the mixed connection of welding seam and friction type high-strength bolt.

 

5. The technology used in conjunction with the structural reinforcement method should adopt the connection technology and repair and repair technology that meet the requirements of this standard.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 橡胶粉碎机_轮胎粉碎机_橡胶切条机_橡胶粉碎机价格_河南鑫世昌机械制造有限公司 | 厦门,泉州自助餐上门|生日自助餐|婚礼自助餐|公司聚会自助餐|户外烧烤|冷餐|茶歇外卖配送-福建非选餐饮公司 | 合金锤头_破碎机锤头_耐磨锤头_巩义市东辰实业有限公司 | 铸造工具|芯撑|铸造毛刷|枣强县永盛五金工具厂 | 螺旋叶片_叶片成型机_叶片冷轧机-深州市广兴五金机械制造有限公司 | 暖气片,暖气片厂家,散热器,暖气片品牌-青岛瑞雪兆散热器有限公司 | 铝型材定制_东莞铝型材_散热器铝型材_工业铝合金型材挤压加工生产厂家价格-中亚铝业 | 墨子百科-专业有趣的问题小百科 莫非传媒官网-江西知名的网络营销推广服务平台南昌网络公司,专业网络公关,品牌危机处理,网站SEO优化,微信朋友圈广告,网站建设,南昌莫非文化传媒有限公司 | 济宁市泓世新型建材有限公司,山东ALC墙板,GRC轻质隔墙板,预制化粪池,复合墙板加工厂家 | 自动锁螺丝机_在线式拧螺丝机_自动化灌胶机_ab点胶机_品牌厂家 | 买化工,找万创!泉州万创化工贸易有限公司| 新余婚庆公司_新余最好的婚庆公司_新余高端婚礼-爱尚婚礼策划 | 渣浆泵厂家/潜水-渣浆泵过流件-管道增压泵 - 河北聚洪泵业有限公司 | 上饶环亚电脑会计培训学校--电脑学校|上饶电脑学校|上饶电脑培训|会计培训|上饶会计培训|上饶县会计培训|广丰会计培训|玉山会计培训|横峰会计培训|上饶网店培训 上进电缆(嘉兴)股份有限公司官网 - 光伏电缆|防火电缆|电力电缆|铝合金电缆专业生产厂家 | 液压万能试验机价格_电子万能试验机|摩擦磨损试验机厂家-济南辰达试验机制造有限公司 | 南洋电缆_南洋电线电缆_广州南洋电缆集团有限公司 | 辽宁大卯新能源供热设备制造有限公司官方网站,大卯新能源,大卯新能源供热设备 | 洁净室、手术室、实验室、无尘车间厂房的净化工程装修设计施工公司-福临建设 | 中华石油化工网 www.cnpec.net——歌颂石化 服务石化 奉献石化 发展石化 | 实验反应釜,高压反应釜,玻璃反应釜,不锈钢反应釜-烟台招远松岭化工设备有限公司 | 无尘车间_洁净车间_净化车间_洁净室工程一站式净化服务商-深圳市美克威尔环境科技有限公司 | 山东正奇塑料机械有限公司,山东塑料机械,水带机组,塑料管材机,山东吹膜机组厂家,山东农膜机厂家 山东长青石油液压机械有限公司-致力于石油机械设备的研发制造,提供定制服务 | 锁螺丝机_自动螺丝机_手持式自动锁螺丝机_自动打螺丝机-普思自动化 | 曙海培训-ZEMAX培训射频培训无线电培训GMS培训EMC培训电磁兼容性培训Maxwell培训欧姆龙培训procast培训可靠性培训光学培训工业机器人培训NI培训Linux培训5G培训Hadoop培训CFD培训 | 山东飞斯特汽车科技有限公司 | 河北永生食品有限公司,益宁挂面, 香海园 | 质检报告_COC_CE认证_LFGB测试_REACH_FCC_FDA-冠通检测 | 湖南净声源环保科技有限公司是一家专业从事噪声治理和建筑声学设计生态环境综合治理服务的企业,专业从事株洲电梯隔音治理,湘潭中央空调降噪处理,衡阳邵阳冷却塔噪音治理,岳阳常德大型风机噪声隔音降噪,张家界空压机噪声治理,益阳配电房变压器噪声治理,专业郴州永州工厂企业车间噪声治理,怀化娄底专业机械设备减振降治理,武汉噪音治理隔音降噪公司,孝感噪音治理,立式球磨机的噪声控制,专业隔音降噪公司,、以及各类机械动力设备减振降噪噪声治理的公司,同时为客户提供咨询与解决方案 | 医疗器械,理化实验室设备,微生物,培养基,一站式采购 - 杭州润泽仪器商城 | 网带窑,催化剂网带窑,电热回转窑-淄博圣元窑炉工程有限公司 | 校园防欺凌|视频一键式报警器|防霸凌报警柱|停车场语音对讲|商铺联网报警|应急广播音柱|居家养老一键通|盾王可视联网运营中心 | 直流电机调速器,直流电机控制器,直流电机调速电源-淄博诚铖创惠电子有限公司 | 真空上料机_加料机_天津自动上料机_投料站_包装机加料_吸料机_粉体称重-天津市飞云粉体设备有限公司 | 碳化钨涂层_碳化钨喷涂_碳化钨焊条_碳化钨合金块-北京耐默 | 上海建发物资有限公司| 上海专升本-上海统招专升本网 | 郫都人才网_郫都招聘网_求职找工作平台 | 真空工业炉-真空油淬炉-真空气淬炉-高温石墨化炉-江苏华弘真空科技有限公司 | 橡皮艇_冲锋舟_充气钓鱼船_橡皮艇价格_海威龙橡皮艇生产厂家-首页 | 盆底肌修复仪器-产后康复脉冲磁训练仪-南京佳澜健康管理有限公司 | 立式/卧式/潜水/液下/螺杆/耐磨/渣浆泵|泥浆泵|离心泵,厂家 - 河北聚盛泵业制造有限公司 |