Structural system used in steel structure plant design

 

Steel structure workshops generally require large space due to process layout requirements. The structure usually adopts a frame structure, and frame-shear structure can also be adopted when the number of floors is large and the process conditions permit.

 

 

The principle of structural arrangement is: try to make the column network symmetrical and evenly arranged so that the rigidity center of the house is close to the mass center, so as to reduce the space torsion effect of the house. The structural system requires simplicity, rules and clear force transmission. Avoid the concave angle and contraction of stress concentration and sudden deformation, as well as the external picking and inward drawing with excessive vertical changes, and strive to keep the vertical stiffness without sudden or less sudden change. Due to the large span direction of the multi-storey factory building, there are fewer columns; while the column spacing direction is smaller and there are more columns. Generally, horizontal control is adopted, so that the seismic capacity in vertical and horizontal directions is roughly the same, which is not only beneficial to earthquake resistance, but also makes the design more economical and reasonable.

 

 

Design site selection of steel structure plant

 

The site selection of the plant design is very important, because the earthquake zone is avoided as much as possible, the expansion joints of the earthquake zone are integrated. When the house is long, the following structural measures and construction measures should be adopted to reduce the number of expansion joints and seismic joints; construction ,Set up a post-pouring zone of 800mm and a width of 1400mm every 40m, and the location of the post-pouring zone should be located in the section where the structure is least affected by the force; on the top floor, bottom floor, gable wall and the wall between the inner longitudinal walls where the temperature is affected For parts such as the body, appropriately increase the reinforcement ratio; thicken the roof insulation layer or set up an overhead layer to form a ventilated roof.

 

 

Fire protection design of steel structure plant

 

The fire protection ability of steel structure industrial plants is very poor. When the steel is heated above 100℃, with the increase of temperature, the tensile strength of the steel decreases and the plasticity increases; when the temperature is about 250℃, the tensile strength of the steel slightly increases , But the plasticity is reduced and blue brittleness appears; when the temperature exceeds 250 ℃, the steel appears to creep; when the temperature reaches 500 ℃, the strength of the steel drops to a very low level, causing the steel structure to collapse. Therefore, the steel structure must be designed for heat insulation and fire protection.

 

 

 To Correctly define the fire hazard categories of building production, and reasonably determine the fire resistance level of the building. According to the "Code for Fire Protection Design of Buildings", the fire hazards of plant production are divided into five categories: A, B, C, D, and E. If the project is determined to be two Grade II fire resistance rating should be protected by adding fire-resistant coatings in strict accordance with the secondary fire resistance rating, so that the steel components can reach the fire resistance limit requirements of the secondary fire resistance rating.

 

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 武汉东湖高新集团股份有限公司官网 | 浙江德威不锈钢管业股份有限公司 | 喷淋清洗剂,铝合金清洗剂-青岛爱大生环保科技有限公司 | 金刚石线切割-电火花穿孔机-中走丝线切割-泰州锐特 | 移动厕所_真空环保厕所_环保厕所_景区生态厕所_雨施捷移动厕所生产厂家 | 华为交换机及防火墙-H3C无线AP-鸿远腾达华为交换机总代理商 | 耐磨焊丝厂-堆焊焊材研发-修复工程-天津舜荣焊材官网 | 重庆自考网-重庆自学考试 | 上饶市新达新包装材料有限公司 | 轻触开关,拨动开关,德艺隆(DEALON)精密工业股份有限公司 | 小型生活污水处理设备_MBR膜生物反应器_口腔医院/脱脂污水处理设备_酸洗磷化/喷涂废水处理设备-上海台江环保 | 机械智能停车设备_智能机械式立体停车库_立体车库停车设备租赁_山东科博机械车库 | 锯骨机-砍排机-全自动锯骨机-商用砍排机-切丁机 - 广州市九盈机械设备有限公司 | 乐云SEO | 品牌营销:抖音小红书关键词优化-ai搜索优化GEO推广 | 南通出国劳务公司-如东海外经济技术合作有限公司-启东,海门,如皋,海安出国劳务 | 济南晨阳科技有限公司-锅巴生产设备-夹心米果设备-膨化食品机械 集装箱零配件_不锈钢丝绳厂家_镀锌铁链条_合页非标件定制_上海英鑫多实业有限公司 | 有源滤波器-高压无功补偿装置-高压无功补偿柜-10KV电容柜-安徽众升电力科技有限公司 | 直流电机维修_杭州高压电机修理-杭州先恒机电有限公司 | 锌铝合金压铸-深圳压铸加工-铝挤压拉伸-压铸模具厂-广东誉格精密技术有限公司 | 吉安天卓选矿药剂有限公司| 惠普工作站_联想工作站_HPE服务器_H3C服务器-河南金铭科技有限责任公司 | 有用的旅游攻略_格林旅行网| 云南破碎机-制砂机-洗砂机-振动筛-昆明昆重机械厂家 | 上海钧尚电器有限公司 - Faulhaber电机 AMETEK pittman电机 AMETEK ROTRON军用航空风机 Exlar电动缸 MAE电机 MCG电机 CP电动工具 马头工具 AMCI驱动器 直流电机 减速箱 直流伺服电机,无刷电机,直线电机 直流防爆电机 防爆电机 汽车助力转向电机 EPS电机 faulhaber motor faulhaber gearbox NANOTEC电机 ELWOOD电机 PHYTRON电机 EXLAR伺服电动缸 高力矩、高性能直流电机,音圈电机,风机,直流风机,航空风机 | 上海舞台灯光音响租赁搭建线阵_年会演出摇头光束面光灯出租_led电子显示屏出租-上海led大屏幕租赁 | 绍兴宇力半导体有限公司官网 | 上海祝融起重机械有限公司-德国耶鲁手拉葫芦|耶鲁手拉葫芦|耶鲁手扳葫芦|耶鲁电动葫芦经销代理 | 圆柱模板_圆柱木模板_方柱加固件_建材板材网 | 深圳中安视讯科技发展有限公司 - 深圳中安视讯科技发展有限公司 深圳展厅设计_产业园区展馆设计_展馆设计公司_健康产业展馆设计_展厅设计哪家好_华竣国际 | 土工布厂家,山东土工布厂家_价格低-山东莱芜「中德利」 | 石膏砂浆生产线_特种砂浆生产线_轻质抹灰石膏设备-青岛环港重工科技有限公司 | 上海舞台灯光音响租赁搭建线阵_年会演出摇头光束面光灯出租_led电子显示屏出租-上海led大屏幕租赁 | 汇讯WiseUC--连接人与业务,以即时通讯为基础的应用集成平台 | 中华收藏网-中藏网-藏品拍卖|字画拍卖|艺术品拍卖|古玩城|收藏资讯|古玩交易|书画定制 | 橡胶粉碎机_轮胎粉碎机_橡胶切条机_橡胶粉碎机价格_河南鑫世昌机械制造有限公司 | 重庆物流公司,重庆商贸货运,工厂物流,同城冷链物流配送,物流软件租售-重庆协通国际物流有限公司 重庆污水处理设备_废气处理设备_纯净水设备-山艺环保 | 山东万利精密机械制造有限公司-高速金属圆锯机,数控高速圆锯机,高速圆锯机生产厂家 | 欧氏运动木地板,体育木地板厂家,篮球木地板价格_欧氏体育木地板 欧派板材官网 | 全屋定制板材 专业供应商 | 在线BMI计算器 - 免费计算身体质量指数(BMI) | 优质课网_收录全国及各省市最新优质课视频,说课视频,名师课例课堂实录,高效课堂教学视频,观摩展示公开示范优秀课视频,教学大赛视频! | 苏州ERP定制|苏州CRM|苏州OA|苏州BPM|进销存管理系统-苏州中尚信息科技有限公司 |