www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Cost control in the design stage of steel structure building
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

Cost control in the design stage of steel structure building

Time:[2020-10-13]  Hits:3467

Engineering cost control in material selection

 

As my country's steel production continues to increase year by year, steel varieties tend to diversify. Various new building materials, such as lightweight thermal insulation wall panels, color-coated profiled steel plates, floor decks, etc., have been continuously developed and promoted. Building steel structures have more room for material selection in the design stage. The choice of materials is different, the direct cost of the project is different, and the total cost is different. Reasonable selection of building materials in the design stage and control of the unit price of materials or engineering quantities are effective ways to control the project cost.

 

 

Many, high-rise steel structure building (roof) floor deck: in design, according to the role in the building (roof) structure system, the floor deck can take two forms, namely ① the floor deck is only permanent The formwork generally adopts ordinary galvanized profiled steel plate, which has lower requirements for minimum galvanizing amount and fire resistance time, and is relatively cheap; ②As a formwork during construction, it replaces the tensioned steel bars in the use stage, that is, composite floor slabs. Since the floor deck is considered as a tension bar in the design, its service life must be consistent with the service life of the main steel structure, so its minimum galvanizing amount and fire resistance time are relatively high, and the unilateral price is relatively high.

 

 

Steel specifications and materials: Due to the increase in steel varieties, there are more types of components available for structural design. For example, frame columns can adopt hot-rolled H-beams, welded H-beams, spiral welded round steel pipes, welded square steel pipes, and combined cross-sections, and steel beams can take forms such as equal cross-sections and variable cross-sections. The material can be Q235 plain carbon steel or Q345 low alloy steel. High-strength materials should be used as much as possible in the design. For example, the use of Q345 steel can save 15%-25% of steel than the use of Q235 steel, and the saving ratio for tensile or bending components is larger. When designing, choose economical cross-section steel, such as hot-rolled H-section steel, T-section steel, etc. In some cases, the use of hot-rolled H-section steel columns and beams may use slightly more steel than the use of welded H-section steel. However, considering the processing cost and construction schedule, the cost may be more advantageous.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: а8天堂资源在线官网 | 中日韩美中文字幕 | 伊人久久大香线蕉资源 | 日本亚洲欧美国产ay | 日韩欧美视频一区二区 | 欧美一区二区三区美人 | 日本一本视频 | 日本xxxx69动漫 | 综合在线播放 | 天天影视色香欲综合影视大全 | 俺来也俺来也天天夜夜视频 | 午夜在线播放免费人成无 | 最近最新的日本中文字幕 | 青青青草视频在线观看 | 美女被男人c | 天天操天天射天天操 | 在线a人片天堂免费观看高清 | 色天使网| 亚洲五月七月丁香缴情 | 伊人色综合琪琪久久社区 | 在线观看中文字幕亚洲 | 996久久国产精品线观看导航 | 泽井芽衣在线精品视频 | 一个人看的www视频高清免费 | 日产免费线路一二区2022 | 中文字幕一区二区精品区 | 婷婷综合久久中文字幕 | 波多野结衣 一区 | 日本免费网站在线观看 | 亚洲国产综合精品中文字幕 | 青娱乐97 | 高傲女教师麻麻被同学调教 | 麻豆视传媒官网免费观看 | 男人天堂亚洲天堂 | 久久久久久秋霞理论网片伊人 | 看中国国产一级毛片真人视频 | 日韩a级毛片免费观看 | 给我免费播放片在线 | 久久精品久久久 | 午夜视频免费 成人 | 三级理论手机在线观看视频 |