Foshan General Steel measuring program

Time:[2016-7-6]  Hits:4245

As the fundamental Foshan steel construction, during construction only, must be applied with a series of measurements and each process, measurement solutions throughout the entire construction process of steel Foshan, Foshan steel construction preparations key First, through high-precision measurement and calibration accuracy of the installation of the steel member to the specified location to meet the accuracy requirements, therefore, after the preparation, the measurement is the most keywords point below Katsukuni steel to introduce the next General steel measuring program

 

First, the measurement and control of all construction work Surveying work required to be responsible for the construction and installation of steel structures, Foshan, with supervision engineers test measurements and all auxiliary work conditions

Second, before the project began, the elevation and coordinate reference point and measuring point provided by the chief engineer, but if you think the information provided by contractors when there are problems, engineers need to think reflect

Third, after receiving measurement reference point provided by contractors, precision measurement of the measurement reference point to go to school, and to review the accuracy of the information and data reference point, and to be reflected in writing Engineer

Fourth, the contractors provide a reference point for the word basis, according to national mapping standards and engineering precision requirements, the control center set engineering and engineers to review

V. baseline, anchor construction, accurate control points and point of construction, after a final measure to detect and measure the positioning point accuracy meets the construction requirements

Sixth, protect the measurement is completed reference point, the reference lines,

7. After the installation is complete Foshan steel, at the same time each day to determine whether the measurement Foshan deformed steel node data, corrected if necessary

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 爱豆传媒国产剧情mv | 天天色天天草 | 91精品国产免费入口 | uusee在线犄兵| 女生说疼男人越用力的软件 | 51精品资源视频在线播放 | 福利精品一区 | 日韩大片免费在线观看 | 日本天堂免费观看 | 色yeye在线观视频 | 亚洲午夜久久久久久91 | 亚洲成人免费网址 | 日本一区二区在线 | 欧美同志同性猛男videos网站 | 91久久国产综合精品女同国语 | 日韩精品亚洲人成在线播放 | 亚洲主播在线 | 久青草国产手机视频免费观看 | 爽爽影院在线18观看 | 亚洲视频一二区 | 99久久国产综合精品国 | 亚洲成人三级 | 香蕉大成网人站在线 | 亚洲六区 | 男人女人一起差差差 | 高h出轨秘书 | 欧派卫浴第一集 | 伊人情涩网 | 巨胸美女扒开腿让我爽 | 一区二区免费看 | 在线观看黄a | 亚洲三级网站 | 2022韩国最新三级伦理在线观看 | 欧美军同video69视频 | 日韩一区精品视频在线看 | 亚洲一区二区三区在线免费观看 | 色多多www| 天天干天天曰天天操 | h成年同人动漫在线观看网站 | 欧美一级视频高清片 | 欧美专区在线 |