Precautions Foshan Steel Design

Time:[2016-6-15]  Hits:4716

Followed by the State to vigorously promote Prefabricated construction today, Foshan steel construction and more subject to our attention. The following are some of Foshan Steel watch point plan for us to see.
A Frame
⑴ portal frame should first determine whether there is a crane, such as plant demand resettlement process requests crane, you should note the following: ① column foot should be planned into a rigid column base; ② column should be planned into uniform section column; ③ between support columns by longitudinal horizontal crane load control programs, rather than a simple construction planning, when there are no less than 5 t crane when, should use steel support. As no crane portal frame, press columns and other practices planning a wedge, not repeat them.
Room ⑵ column support resettlement
Between the columns support the roof support pillar should be placed in the same room, so that the formation of a stable system of longitudinal frame, frame means to facilitate and increase the longitudinal stiffness. Support should be placed between the top of the second column by column from time to time, when placed in the second inter-column list when the appropriate placement of a rigid column tied, and the rigid tie rod and the wind column longitudinal orientation together, make a direct transfer wind loads. The turning point in the frame (single-span roof of the house and column capitals and some centers and multi-span pole in the house and the roof) should be set rigid Tied houses along the entire length. When larger span gantry in place between support columns should be appropriate to increase the number of rigid tie rods that support the angle is about 45 °. When the construction of functional constraint that can not be disposed between the support column, should be placed longitudinal frame. And that they've done this to make a rigid connection between the end of the column beams, studs and then cancel the support of engineering, construction make placement more flexible, with good results.
⑶ roof and wall construction
Roof and wall construction approach is to increase the stiffness of the frame, the key way to avoid the outer frame plane instability. Purlins, wall beams generally composed of cold-formed thin-walled structures formed when the column spacing less than 6 m, when designing a brace, more than 6 m, located two brace. Here should be mentioned especially the oblique bars, school diagram process, we often see a lot of steel structure manufacturers or planners provided the oblique strut bar without setting conditions. Factor is the construction concept is not very clear, because after construction mechanics, disposed between the oblique strut bar, before the formation of a stable system. In the roof, walls planned resettlement should also be noted bracing, bracing is not a luxury it is to avoid perverting the compression flange provided. Studies have shown the first portal frame damage due to pressure caused by perverting the largest flange. Oblique inner flange beams converge at the column flange and frame is the emergence of perverting vital parts, there is provided bracing is very important. In addition, the "portal frame light house steel construction technical specification" CECS102: 2002 (hereinafter referred to as CECS102: 2002) rules: oblique beams in the bottom flange of the compression zone is also set bracing, a distance not greater than the corresponding compression wing edge width of 16 (235 / fy) 0.5 times. When you press a general portal frame, purlin distance of about 1500 mm, a spacer is provided a bracing purlins above conditions can be satisfied.
⑷ shear key
"CECS102: 2002" rules: column anchor should not be used to withstand the horizontal shear column foot portion, the horizontal shear force by friction between the floor and the concrete foundation (friction coefficient desirable 0.4) or set shear joints bear. This is the time of our accounting mast, usually displayed warning: "Let Shear pedestal demand!"
Analysis of these factors, the main door is made generally lighter weight structure, column friction soles of the feet and between the concrete foundation is small enough to resist lateral wind loads and seismic effects, it should set the shear key. Usually the shear key beam with angle iron or steel, the shear bearing capacity of the cross section of the weld should be accounted for, columns and soles of the feet of open space between the surface of the foundation secondary grouting. Specifically refer to "many high-rise residential construction steel structure node configuration detail" 01SG519 diagram on page 30 to gather a large sample 1,2 practices.
Means for positioning the column anchor ⑸
This is the planners generally ignores questions and anchors positioned in engineering practice inaccuracy or rigid frame construction of the device difficult project case everywhere, we also encountered such a situation, and later had to reinforcement. Analysis of factors, notably the non-convergence between the anchors, the overall stiffness of the poor in the process of pouring concrete in the anchor inevitably shift. In response to these factors, taken before pouring concrete column anchor embedded fixation process, the specific approach shown in Figure 1. Mounting bracket and bolt to form a small lattice columns, positioned so the anchor would facilitate accurate. ⑹ wind columns and frame the current convergence of wind portal frame column planning practice there are two mistakes: one is the wind column and frame made of the same wind columns and beams or hinged frame or just then, the wind column to both wind and participate vertical load effect and the effect of the horizontal level. The planners do not usually do such a frame of longitudinal wind checking. This is done omissions load, Project Planning is a taboo. I think you are a force bent structure that clearly should not complicate it by force. This approach is defective; Another approach is to wind column and frame on one axis, but do not think that wind column vertical load effects wind between columns and beams with a steel frame after welding joints connected. This practice is still a part of the vertical load transmitted to the column of wind, and the steel sheet is small lateral stiffness, vertical load at the onset of the effect is difficult to ensure that there is barely after the land transfer the wind load. These two approaches have disadvantages. Here we recommend the following practices:
Plant selection do legal grids, Pin top frame column axis wind shifted 500 ~ 600 mm, wind through the column flange adapter plate is connected to the frame beam stiffeners and plate convergence and vertical stiffener open a long hole, use an ordinary bolt adapter bolts approach shown in Figure 2. Figure 2 wind column and frame adapter bulk sample
Plan 2 steel structure
Select ⑴ steel building systems
Common constructions of steel construction system can be divided into pure and construction - support systems into two categories. Highly selective and construction material systems, the use of closely-related features. This requires the construction engineer should work closely with the architect, when the construction of functional constraint can not be set because the support system should be used pure structure. Pure system configuration because no anti-sway support, two vertical and horizontal directions to satisfaction, "the construction of earthquake planning standards" GB50011-2001 (hereinafter referred to as "anti-regulation") Section 5.5 of the elastic layer between the displacement angle less than or equal request 1/300, beam the column in vertical and horizontal directions should just pick; because of "anti-regulation" section 8. 3.4 rule: "when the column in two mutually perpendicular directions and beam rigid connection, should use box-section" Therefore, use of pure construction system, usually planning to box column column column inside the box but the process of applying rust and proper maintenance difficult, which is steel construction planning a major problem. They are also trying to choose the column method of pouring concrete in the plan, but because the box column separator disposed stiffening node area, pouring concrete very difficult; on the other hand, the country is still in the concrete pipe during the discussion, common planning software can not be accounted for accounting theory in the Journal of the different. Based on the above factors when planning constructions of pure steel, most still use non - concrete box section column. Own labor process selected word column strong and weak axes are rigid convergence algorithm, according to the "anti-regulation" section of Article 8.3.4 of the text is selected, "should", see also the mainland large selection of drawings and Planning Institute said planning in spreadsheets method, but calculation results are not satisfactory, the elastic layer between the weak axis direction displacement angle is still unable to meet the request, "anti-regulation" of Article 8. 3.4. Because the box column in the structure of some tough, so the idea when planning a multi-layer steel cylinder-shaped house built try to use planning to construct - support system. Construction engineers and construction division to coordinate as much as possible, through resettlement in demand resettlement support bearing floor, elevator, which do not open big hole in the wall to achieve the support of stealth. The results indicate the accounting practice engineering, construction support displacement control effect is very good, so that in addition to the choice of column-shaped material saving, anti-rust, the use of easy maintenance, easy convergence weak axis direction, it is a useful method.
⑵ node Planning
Steel structure node planning is the key to planning steel structure. Hinged nodes simple, clear contact mechanics, where not too much to say, just focus on what connected node planning. Moment resistant convergence plan, "anti-regulation" 8 3.4 Recommended use Standard Figure 8. 3.4 - The node 1 in the form, in engineering practice are mostly chosen is such a node. This node has two accounts in accordance with: accurate programming and general programming. The difference between the two is that the former Reflections bending and shear webs, the latter only ponder web shear. Accurate planning law planning in practice, difficult bending webs satisfied request must be thickened to a large extent the web. The approach is very thick web of economic, so most use common project planning method, this accounting model Mechanics clear, simple accounting, but must pay attention to planning to take measures to strengthen the earthquake, such as the use of the plastic hinge relocation enhanced convergence or end of the beam away from the beam ends not far from the upper and lower flange beams weaken dog bone convergence. This is because, in the end without any reinforcing beam flange case, only ponder web convergence shear bolts bear, bear moment by the flange weld, then weld flange flexural capacity of only about 80% capacity BEAMS (that is, only beams with the section modulus of the beam flange section modulus of about 80%), then press the "steel construction planning standards" on page 3. 2.2, thinking construction site conditions weld strength reduction factor 0 is multiplied by the value of planning. 9, then the flexural capacity of the beam flexural capacity of Cohesion only 70% to 75%. This strong convergence node ratio is even lower 30% to 25%, in violation of the "earthquake not fall," the basic principles of earthquake "strong nodes, weak bars." Based on the above factors, it should be used "many high-rise residential construction steel structure node configuration detail" earthquake shown on page 19, 20 01SG519 portfolio strengthened approach.
Else
In our "anti-regulation" and "the Rules" the rules were not steel structure seismic level, just 12 minutes and 12 layers or less standard and two or more layers. I thought it was relative to our vast big difference around the fortification is characterized by inappropriate. Old "the Rules" in the multi-set size of a house built high-rise steel expansion joints no rules, only single industrial plant made some rules. These two points are the conceptual big question, "the Rules" does not emphasize these two points is appropriate.
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 卫生间隔断-东莞卫生间隔断-东莞卫生间隔断厂家-公共卫生间隔断-东莞市康丰家居建材有限公司 | 仪器校准-计量检测-计量校准-中健计量检测(广东)有限公司 | 武汉印刷厂_为企业提供宣传单页彩页印刷_武汉折页印刷_海报设计印刷与制作 - 武汉泽雅印刷公司 | 金酱酒_金酱酒代理加盟招商_OEM贴牌企业定制! – 金酱酒代理加盟!茅台镇较早的酿酒烧坊,年产优质酱香白酒5000余吨,仁怀市十强白酒企业,主营主品:金酱酒、金酱陈香酒、酱香老酒等系列品牌产品 | 青州市泰航机械设备有限公司 | 军用笔记本电脑_三防加固笔记本电脑_平板型全坚固计算机-集海卫通 | 喷雾式干燥机-真空桨叶干燥机-桨叶干燥器-常州力马干燥科技有限公司 | 启东华立石油化工机械设备有限公司|过滤器|混合机|消声器|混合器|管道过滤器|空气过滤器|精细过滤器 | 深圳市福田区建筑装饰设计协会 | 毛刷_毛刷辊_工业毛刷辊厂家_毛刷加工制造厂【丰汇刷业】 | 天津实验室纯水机-GMP认证制药纯化水设备-天津开发区瑞尔环保科技有限公司 | 苏州不锈钢_江苏不锈钢_江苏不锈钢板_苏州模具钢_苏州合金钢_苏州特种合金_苏州不锈钢板_304不锈钢棒_苏州塞硒五金制品有限公司 苏州ERP定制|苏州CRM|苏州OA|苏州BPM|进销存管理系统-苏州中尚信息科技有限公司 | 厦门空压机-厦门空压机出租-厦门钻机出租-厦门岩立盛机电设备有限公司 | 天象文仪办公家具,25年一站式配齐经验厂家-办公家具官网 | 深圳办公室装修_办公室设计_写字楼装修设计_深圳市加洲建设集团有限公司 | 塑料检查井_双扣聚氯乙烯增强管_双壁波纹管-河南中盈塑料制品有限公司 | 无锡大型数控龙门铣,喷涂加工,回火抛丸加工,精密不锈钢焊接机床身机床底座制造加工-无锡美高帝机械有限公司 | 吸附式干燥机|零气耗压缩热干燥机|无锡气净法工业技术有限公司【官网】 | 聊城钢管厂,无缝钢管厂家-山东旺耀金属制品有限公司 | 潍坊铝单板_铝方通及氟碳喷涂材料供应企业-潍坊冠杰金属制品有限公司 | 小型环境空气质量连续监测系统-烟气排放连续监测仪(碳排放)-青岛明德环保仪器有限公司 | 景县泉兴永塔业有限公司-广播电视塔、通信塔、电力塔、交通设施、监控杆塔、气象塔、森林防火瞭望塔、避雷塔、烟筒塔、训练塔 | 浙江福茂德汽车滤清器有限公司| 芜湖净水设备-纯水设备-无负压供水设备-不锈钢水箱-芜湖市百川给水设备有限责任公司 | 耐磨螺旋叶片_耐磨螺旋绞龙_KNM螺旋耐磨材料-北京耐默 | 郑州长城冶金设备有限公司 | 王者荣耀/和平精英扫码上号登录器_微信安卓苹果扫码上号登录软件 - 上号宝扫码登录器 | 铁谷网-垂直于铸造产业链服务平台、原材料采购网、行业资讯网 | 水泥纤维瓦机 石棉瓦机 硅酸钙板生产线 | 液压万能试验机-液压式万能试验机-万能试验机厂家-济南鸿君试验机 | 一氧化碳检测仪_氢气报警器_臭氧分析仪-深圳万安迪 | 上海中医医院_上海名老中医专家门诊_上海徐浦中医医院 | 泰州光明会计师事务所有限公司-财务业务审计,会计服务业务及资产评估业务的专业服务机构 | 企业资质代办-代理全国工商注册公司_公司转让_增值电信业务许可证新办续期-大通天成科技[gw] | 液力耦合器,摩擦型液力耦合器生产厂家-河南省华升矿机有限公司 | 碳减排领域专业技能人才培养工程综合服务平台 | 铝合金热处理设备_天然气铝棒加热炉_QPQ热处理设备-浙江长兴天源炉业科技有限公司 | 全功能护理训练模拟人-创伤护理人-高级电脑心肺复苏模型-上海康季 | 陕西筱润智能科技有限公司 干部人事智能档案柜 智能密集架 智能档案柜 部队选层文件智能柜 智能枪弹柜 财务智能档案柜 边防武警智能密集架 医院智能档案柜 部队选层文件智能柜智能枪弹柜 学校医院文件柜 企事业单位公检法智能文件柜 生产厂家-筱润智能科技有限公司 RFID射频智能密集架 全自动智能选层档案柜 智能密保柜 枪柜部队营房营具床桌椅办公家具 办公用品档案盒设备货架 全自动智能选层柜生产厂家-筱润智能科技有限公司 | 河南桥式起重机-河南门式起重机-宇华起重设备集团(官网) | 商易网-b2b电子商务平台网站大全免费B2B发布供求信息网站 |