Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4923

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 欧美又大粗又爽又黄大片视频 | 日日日日干 | 成人国产在线24小时播放视频 | 一级黄a | 成人在线免费视频观看 | 欧美日韩国产高清一区二区三区 | 男人猛躁进女人免费观看 | 久久91精品国产99久久yfo | 一个人看的在线www片高清 | 美女草比 | 色先锋资源站 | 青青草国产97免久久费观看 | 人操人视频 | 日日干夜夜欢 | katasumi经典最新 | 亚洲图片在线欧美专区图片 | 女人跪着吃男人j动态图 | 久久久久综合国产 | 日本三级网站在线线观看 | 日韩免费视频在线观看 | 欧美亚洲国产日韩综合在线播放 | 污污在线观看视频 | 成人免费在线观看视频 | 亚洲码和乱人伦中文一区 | 在线av片无需播放器 | 中文字幕亚洲综久久2021 | 五月婷婷一区二区 | 成人福利片 | 久久国产精品一国产精品金尊 | 性日韩精品| 成人影院在线播放 | 亚洲欧美在线观看一区二区 | 亚洲成在人线影视天堂网 | 美女网站在线观看 | 亚洲国产乱码在线精品 | 一色屋精品免费视频 视频 一区在线观看 | 欧美性黑人极品hd网站 | 欧美国产伦久久久久 | 日本视频在线看 | 天天看片天天操 | 美女被羞羞产奶动漫 |