Foshan main steel members (b)

Time:[2016-5-14]  Hits:5289

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日韩精品免费在线视频 | 美女扒开尿口给男人看的让 | 一级一黄在线观看视频免费 | 日本在线视频网址 | 福利社在线观看 | 美味的妻子在线观看 | 中文字幕在线免费视频 | 欧美人成片免费看视频不卡 | 亚洲欧洲一区二区三区在线观看 | 伊人色影院 | 免费观看呢日本天堂视频 | 四虎在线播放免费永久视频 | 美女战士被触手怪非礼漫画 | 欧美午夜精品 | 天天做夜夜爽 | 伊人草草| 免费国产视频 | 婷婷久久综合网 | 毛片免费在线观看 | 青青草污视频 | 日日添天天做天天爱 | 夜夜爽天天狠狠九月婷婷 | 亚洲日本视频在线 | 一本久久道 | 插美女逼视频 | 日韩高清中文字幕 | 天天看天天干天天操 | 一二三四视频中文字幕在线看 | 久青草国产视频 | 日韩精品一区二区三区 在线观看 | 1024香蕉 | 午夜精 | 再猛点深使劲爽免费视频 | 欧美熟juliaann厨房 | 日本欧洲亚洲一区在线观看 | 日韩黄色a级片 | 庆余年第二部在线观看免费完整版 | 欧美一级特黄刺激大片视频 | 欧美在线网 | 亚洲国产精品久久精品成人 | 欧美专区亚洲专区 |