Guangzhou Steel construction technique which span a large space?

Time:[2016-4-20]  Hits:4407

Guangzhou Steel construction technique which span a large space?

 

Guangzhou Steel Slide the laws generally can be divided into two types: structures by supporting sliding method. The following were introduced Guangzhou Steel construction features of the two methods.
 
Slip Method: The basic idea is to structure the whole (or partial) in the first assembly with the conditions of the site assembly forming, re-use sliding systems designed to shift the overall position of installation method. With this installation technology, assembly site and assembly machinery and equipment can be focused on a relatively fixed venues, as compared with in situ mounting method can reduce the amount of temporary support measures and operating platforms, space-saving processing and management costs. First with the structures by which key consideration in the design of the structure of direct construction difficult position, for example outside the periphery of the construction site is limited, can not meet the normal walking across the inner lifting equipment. The basic elements of this construction method is to "enhance the overall engineering," the assembly ground reaction force support, enhancing the overall replaced by "lateral movement", so essentially the same method to enhance the work.
 
At the same time, using this method should at least pay attention to several points: a support structure at the slip in favor of laying the track, slip line length, the higher the efficiency; slip unit should geometric invariant system, slip process is sufficiently rigid and stability, resistance to minimize slippage when. When using multi-point traction slip is achieved, in order to avoid twisting structure during sliding, traction synchronization must be controlled if it is difficult to ensure that, should fully assess the impact calculated by the traction unit is not synchronized to slip caused when necessary, temporary reinforcement of the slip unit. Slip unit before the final fixed structure exists in a direction orthogonal to the direction of movement of "easy slip" trend, because the conditions are different and the design of supports, designed to prevent the outside (ie, the slip plane) of the deformation, it is necessary to take prevent the "fall" of measures, such as setting a rigid rod or flexible cable from the balance on both sides of the support nearby.

In addition, the structure of sliding method further comprises two different processes: Pin slip by, the cumulative slip.
Pin slip by: the slip unit or a Pin Pin composed by a number from one end to the design position, between the sliding unit at high altitude were connected directly to form a unitary structure.
Cumulative slip: slip upcoming unit on the rail just slip some (temporarily moved to the design position) to be connected to the next unit and then slip a distance, and so forth, by Pin accumulated until each unit Pin push to the design position.
In general, large-span space steel structure and installation method, can not be set when the temporary support or the use of a crane to install the poor, that is, direct construction of buildings at the position in question, Slip engineering methods can be used as solutions one.
Supporting sliding method: sliding method is supported in the structural design of the Group erection support frame structure in place in order to provide support for installation and operation of the platform, to be part of the structure of the installation is complete, the support that is already installed sliding structure Bi out. Such is the structure of the adjacent in-situ installation created the conditions, and so on, until the completion of the structure of the overall installation. Thus, with different structures by supporting sliding method can be summarized as "structure does not slip and slide support mechanism" and Slip law is "structural support mechanism does not slip and slide." When using the support sliding method, in addition to the support structure is designed to meet the general global and regional stability, but also consider the level of dynamic load (start-up and braking effect caused by the horizontal inertia force), can be added a large brace if necessary to improve its anti lateral stiffness. To sum up, since this method to be occupied structure across the venue, so when the surrounding environment is difficult to provide a splice site structure supporting sliding method can be used as one solution. It is worth noting that, regardless of the support structure or slip slip method, the sliding track in addition to the conventional linear translation, the slip curve is also not uncommon, frequently used in engineering practice.
 
Enhancing the overall installation method: Installation method to enhance the overall structure is to be installed on the ground floor or a suitable projection assembly forming position, and then use the "lifting system" will enhance the overall upward to an installation method of shaping the design elevation structure. When large-span steel structure height is higher, not conducive to the erection of supporting tire rack, lifting steel shape rules, enhancing the overall construction methods can be employed as an option.

Large-span steel structure cantilevered unsupported installation method: the so-called large-span steel structure cantilevered unsupported installation method that is not in the erection of the support mechanism of the conditions to the stiffness of cantilevered steel body based on the use of mechanical lifting at height parts installation, use and gradually extended phase of the installation way for construction. Relatively high altitude in situ installation method, although the labor law is also in the vicinity of high-altitude Situ installation, but does not entirely because of the temporary support mechanism, measures less construction, the construction process is simple (no unloading). Suitable structural body stiffness, good stability, high height cantilevered steel. With this construction method, by the influence of its own weight, will be cantilevered section under torsion, and the resulting problems is to install the coordinates of an unknown member of the encounter when the mounting position or shape required the presence of the closure case, the bit configuration of the construction process shape control is one of the biggest technical problem, which is directly related to the construction field configuration when completed can meet the requirements, and the cantilevered section smooth closure.
 
Guangzhou Steel for large-span steel structure construction, the original high-altitude air unit installation method, slip mounting method, enhancing the overall law and large span cantilever mounting method is currently unsupported several typical and common construction methods, but its application must grasp conditions and key technical points, in engineering practice, a reasonable choice. Especially in recent years, most of the projects has a unique architectural style, bring many difficulties to the construction in particular installation. A deep understanding of the structure of the composition of these projects, to understand its load transfer path, familiar with the specific requirements of the project area where the ambient conditions and the engineering, construction and available resources and master their own proprietary technology to local conditions to design the most appropriate , get rid of the installation program, it is the pursuit of the highest level of construction technology.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 驾驶洗地机|手推洗地车|天津洗地机|扫地车|仓库工厂扫地机|工业吸尘器|扫雪机|耐洁思 | 郑州阳光房|封阳台|钢结构【河南郑州如意阳光房门窗有限公司】 | 重庆消杀公司-重庆斗哥环保科技-灭鼠公司-重庆灭蟑螂-除四害-灭老鼠-灭虫-重庆灭白蚁公司 | 威海牙科,威海种植牙,威海人工种植牙-威海经济开发区姚晓艺口腔诊所 | 柱塞泥浆泵|压滤机专用泵|陶瓷泥浆泵_咸阳华星泵业有限公司 | 襄阳亚舟重型工程机械有限公司 | 上海中泉泵业制造有限公司-柴油机泵,一体化泵站,柴油机消防泵,泵站,预制一体化泵站 | 泰安兴润建材有限公司,泰安井盖定做,泰安警示桩定做,泰安雨水篦子定做,泰安操场篦子定做,泰安标志牌定做 | 云南昆明微信公众号小程序开发公司|抖音|网站建设APP制作-鸿翥网络 | 永康微网站建设、永康手机网站建设、永康营销型网站建设、永康外贸网站建设、永康网站托管、永康网络公司—英汇网络 - 永康市英汇网络技术有限公司 | 上海须进光电科技有限公司| 南京仁康体检--南京仁康门诊部有限公司 | 山东发电机组生产厂家,特种火花塞生产厂家,高压线生产厂家,空气滤芯生产厂家,济南市博盛动力机械有限公司 | 麦秸映像网络技术有限公司,河南省政府采网入驻对接,新乡网站维护建设,小程序开发,APP定制开发,钉钉开发,新乡软件开发等相关网络业务 | 杀菌剂_除藻剂_杀菌灭藻剂_1227杀菌剂_中北精细化工 | 苏子富春品牌馆 抚顺市富春农业科技开发有限公司 抚顺特色农产品 抚顺市特色馆 | 免费建站_自助建站_网站建设_企业建站_中小企业建网站_免费网站模板-牵牛建站 | 湖南净声源环保科技有限公司是一家专业从事噪声治理和建筑声学设计生态环境综合治理服务的企业,专业从事株洲电梯隔音治理,湘潭中央空调降噪处理,衡阳邵阳冷却塔噪音治理,岳阳常德大型风机噪声隔音降噪,张家界空压机噪声治理,益阳配电房变压器噪声治理,专业郴州永州工厂企业车间噪声治理,怀化娄底专业机械设备减振降治理,武汉噪音治理隔音降噪公司,孝感噪音治理,立式球磨机的噪声控制,专业隔音降噪公司,、以及各类机械动力设备减振降噪噪声治理的公司,同时为客户提供咨询与解决方案 | 首页 网络安全与数据治理(原《信息技术与网络安全》) | 呼吸家官网|肺功能检测仪生产厂家|国产肺功能仪知名品牌|肺功能检测仪|肺功能测试仪|婴幼儿肺功能仪|弥散残气肺功能仪|肺功能测试系统|广州红象医疗科技有限公司|便携式肺功能仪|大肺功能仪|呼吸康复一体机|儿童肺功能仪|肺活量计|医用简易肺功能仪|呼吸康复系统|肺功能仪|弥散肺功能仪(大肺)|便携式肺功能检测仪|肺康复|呼吸肌力测定肺功能仪|肺功能测定仪|呼吸神经肌肉刺激仪|便携式肺功能 | 水上浮筒_塑料浮筒_龙舟码头_浮筒浮动码头-黄山耀利水上设施有限公司 | 行李快递安检机-便携式X光安检仪-行李安检机-液体-爆炸物探测仪-安天下安检设备 | 合金锤头_破碎机锤头_耐磨锤头_巩义市东辰实业有限公司 | 木箱_木箱包装_出口木箱设计_熏蒸木箱价格_包装木箱厂 | 泊头市鸿海泵业有限公司--导热油泵,高温油泵,沥青保温泵,圆弧泵,齿轮油泵,高粘度泵,自吸离心油泵,罗茨油泵为主的专业生产厂家 | 耐腐蚀磁力泵,直立式耐酸碱泵,立式耐酸碱泵,自吸式耐酸碱泵-杰凯泵业【官网】 | 木箱_木箱包装_出口木箱设计_熏蒸木箱价格_包装木箱厂 | 皮带输送机-宁津县浩发链条有限公司| 履带吊租赁-履带吊出租-出租履带吊车-出租履带吊-吊车出租-履带吊出租公司 | 膨胀节_波纹膨胀节_非金属膨胀节_波纹管补偿器_膨胀节厂家-江苏苏创管业科技有限公司 | 思行科技-珠海小程序开发-珠海网站建设-珠海APP开发-江门小程序开发-江门网站建设-江门APP开发 | 山东胜王水处理设备有限公司,反渗透设备,纯净水设备,污水处理设备,SWS系列全自动钠离子交换器,纯净水设备报价,活性碳过滤器,多介质过滤器 | 智能照明模块_智能照明控制器_照明控制系统_智能调光模块_西安邦华电气工程有限公司 | 湖南众一离心机股份有限公司_活塞推料离心机_沉降离心机_卧式刮刀离心机 | 买化工,找万创!泉州万创化工贸易有限公司 | 天力普电力科技有限公司| 污泥处理设备|污泥固化固液分离压泥机压滤机厂家-山东冠诚开山贸易 | 潍坊劲昊磁电科技有限公司-电磁除铁器,永磁除铁器,管道式除铁器,金属探测仪,磁滚筒,输送设备,给料设备,破碎设备 | 漳州市鼎新拍卖有限公司 | 临沂网站建设,临沂网站制作,临沂网络公司,临沂小程序开发,临沂网站设计,沂水网站建设,沂南网站建设,蒙阴网站建设,平邑网站建设,费县网站建设,兰陵网站建设,郯城网站建设,临沭网站建设,莒南网站建设,兰山网络公司 | 河南粮食投资集团有限公司-河南粮食投资集团有限公司 |