Guangzhou Steel curtain wall construction and process all-glass structures

Time:[2016-4-9]  Hits:4433

Guangzhou Steel curtain wall construction and process all-glass structures

 

 

Installation of Guangzhou Steel full glass curtain wall is more than one joint construction trades, a very complex process, and the operation also requires very fine, requires teamwork team. But it also has a close relationship with the construction schedule of other sub-projects. To make the construction and installation of steel curtain wall smoothly, the project must be based on the actual situation, compile the individual construction organization design, and confirmed by the general contracting unit.

Project started preparatory work
Technical data collection

On-site data collection and civil design of civil structure size measurements. Because there may be some fluctuation civil construction, the actual size is not always in line with the design drawings. Full glass curtain wall on the civil structures related to the higher size requirements. So before the site must be designed to measure, obtain first-hand information and data. And then to draw the curtain separating practical view of the requirements of owners. For door entrance of the site, also must make automatic revolving door, full glass door unit with the glass curtain wall on the door and the door of a reliable shut. But also need to meet requirements for the installation and maintenance of automatic revolving door.

Design and construction plan was finalized

Design and construction plan was finalized. When glass curtain wall design partition, in addition to considering a uniform aesthetic appearance, it should also be taken to minimize the glass specification models. Because all kinds of outdoor architectural design are not the same, to have a large outdoor canopy, driving ramps and other projects, more attention should coordinate the overall construction schedule and order and prevent the construction and other outdoor facilities, the impact of walking crane and glass curtain wall installation. Before the formal construction, but also to deal with the scope of the construction site be flattened infill, good site clean-up, to ensure the smooth running crane.

Prepare materials and mechanical equipment
The main material quality inspection

(1) glass sizes are correct, with particular attention to check the glass during storage and transportation process, whether the damage found to have cracks, chipping the glass must not be installed, and shall immediately notify the reprocessing plant supplement soon as possible.

Material (2) structural metal member meets the design requirements, whether straight member, processed size, accuracy, hole location meets the design requirements. Good anti-rust paint to brush first, to all the member number clearly marked.

 

The main construction equipment inspection

(1) glass lifting and transportation machinery and equipment inspection, especially for crane operating system and electric chuck performance checks.

(2) Check the performance of a variety of power and hand tools.

(3) embedded parts location and design of the position deviation should not exceed 20mm.

Scaffolding

Due to the different needs of the construction program, construction scaffolding structures must meet different requirements.

(1) discharge line and production load-bearing steel frame, should be set up on both sides of the glass curtain wall surface, to facilitate workers, such as welding and installation work at different positions.

(2) When installing the glass curtain wall should be built on the inside of the curtain wall. To facilitate the lifting obliquely inserted into the glass does not touch the scaffolding, but also make the upper and lower parts of the standing scaffolding workers can easily hold the hand sucker can assist crane glass exact place.

(3) the glass in place after dispensing and cleaning phase, then the need to build a separate row in the outdoor scaffolding, due to the large area of ​​continuous full glass curtain wall, unable to communicate with the outdoor scaffolding then pull the main structure, so pay special attention to the scaffolding support and stable, can land anchors, rope and pull with a bracing strut connection. Construction of each operation to be laying layer height scaffold boards, have a top rail, scaffold boards use wire fixation. In the construction and dismantling of the scaffolding to be extra careful not to throw down throw and steel fasteners from a height, to prevent damage to the glass.

 

Guangzhou Steel curtain wall installation
Guangzhou Steel curtain wall installation steps roughly as follows:

1. actinomycetes positioning;

2. The upper portion of the load-bearing steel structure installation;

3. The lower portion of the side frame and installation;

4. glass in place.

5. Note sealant;

6. Surface cleaning and inspection;

Maintenance and repair
At present, all-glass curtain wall maintenance and repair of the owners have not been enough attention. Now full glass curtain wall material used has a certain validity period should be observed regularly and maintained in normal use, so after Labor Exchange acceptance, and use of best developed curtain wall maintenance and repair program, and signed a contract with the company.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 中国建材信息总网-中国建材行业权威的信息资讯平台 | 永康微网站建设、永康手机网站建设、永康营销型网站建设、永康外贸网站建设、永康网站托管、永康网络公司—英汇网络 - 永康市英汇网络技术有限公司 | 赛车微信群二维码平台下载【找群网zhaoqun5.com】 | 宿迁市华泰交通设施有限公司,上海第四代路名牌,天津仿罗马柱路名牌,标准路名牌,路名牌灯箱,公交站台,户外广告灯箱, 交通标志牌,社区阅报栏 | 途远VR+_成都VR全景制作_成都360全景漫游_成都720全景航拍_成都途远科技有限公司 | 天津安检机-天津安检门-安检设备租赁-安检设备厂家-华创永信 | 辽宁东亚种业有限公司| 深圳市佳顺优印印刷有限公司,佳顺优印,画册印刷,海报印刷,封套印刷,手提袋印刷,包装盒印刷,彩盒印刷,无碳纸印刷,不干胶印刷,信封印刷,便笺印刷,笔记本印刷,台历印刷,挂历印刷,国际会展中心附近印刷厂,宝安印刷厂,宝安教材印刷厂 | 游戏加速器-极迅互联加速器-更快更稳的网游手游免费加速器 | 噪声治理,消声器,隔声屏障,隔声罩,噪声控制,降噪,空调降噪,水泵噪声治理,冷却塔噪声治理-北京华清恒业环保设备有限公司 | 硬脂酸钡_硬脂酸镁_硬脂酸镉_硬脂酸铝_硬脂酸锌-石家庄中石恒达矿产品有限公司 | 中国(北京)国际园林绿化设备展览会 | 金诺国际拍卖集团有限公司--金诺国际拍卖集团有限公司 | 太阳能杀虫灯-农业用杀虫灯-果园灭虫灯厂家「尚科杀虫灯| | 浩通集团 国际货运 物贸一体化 中非经贸 | 山东洗地机_工业洗地机_驾驶式扫地机_扫地车厂家_鼎洁盛世官网 | 艺术网 - 大型艺术类权威门户站 艺考培训-中影人教育 【官网】-中国艺考教育的引航者 | 模具配件加工厂|东莞模具配件加工|模具配件加工厂|精密塑胶模具配件|东莞市优迪精密模具制品有限公司 | 内蒙古天奇生物科技有限公司——OEM代工|ODM定制|原料供应|骨肽|片剂|胶囊剂|口服液 | 立式离心泵_不锈钢自吸泵_液下泵_变频无负压供水设备-大东海泵业无锡有限公司 | 前途汇医药科技(北京)有限公司| 树脂门|卫浴门|医院门|医院专用门|卫生间门—湖南航天康达树脂门 | 压力变送器,差压变送器,液位变送器,温度变送器生产厂家价格-西安仕乐克仪表科技有限公司 | 雷达液位计_耐磨热电偶_蒸汽_柴油,汽油_天然气流量计_巴歇尔槽_一体化温度变送器-江苏翔腾仪表有限公司 | 西安测试仪-西安电压测试仪-西安电流测试仪-西安热油汽水测试仪-西安阻抗测试仪-西安时间速度测试仪-西安电力设备厂家-西安中洲电力设备有限公司 | 烟台天昊矿业有限公司、滑石、滑石粉、微细粉、滑石矿-烟台天昊矿业有限公司 | 消防排烟风机|3C排烟风机|正压送风机|高温排烟风机|柜式排烟风机-山东锦松环境设备有限公司 | 西安宣传片拍摄,陕西艺景网络科技有限公司资料备份,西安影视公司,视频拍摄制作,抖音视频制作,纪录片拍摄西安短视频摄影团队,西安抖音视频拍摄 | 昆山精鑫模具有限公司-模具研发生产 | 一站式服务体验 | 远红外桑拿房-江苏侨达健康科技有限公司 | 泰州阳光会计服务有限公司官网-泰州公司注册|泰州代理记账 | 上海珑析仪表有限公司 | 湖南长沙癫痫病医院_湖南癫痫病专科医院_湖南治疗癫痫病专业医院_长沙和谐医院有限公司 | 济宁卡尔迪机械制造有限公司_铁路换枕机_升降驾驶室_挖机加高底盘_加长臂 | 医用手摇病床,医用电动病床,康养手摇病床,康养电动病床-河北丁丁医疗器械有限公司 | 江寒必恋术在线阅读_江寒必恋术免费下载 - 江寒必恋术电子书 | 全自动视觉点胶机|在线式点胶机|精密点胶阀设备厂家-杭州迈伺特科技有限公司 | 九九信息网-专业的分类信息网站| 宿迁网站建设-宿迁做网站-宿迁网站制作-宿迁网络公司-宿迁网页设计-宿迁软件开发-宿迁新动力软件开发有限公司 | 饮料瓶-白酒瓶-绿色玻璃瓶-山东玻璃瓶厂家-枣庄市金泰玻璃有限公司 | 石材雕刻机_墓碑雕刻机_木工雕刻机_雕刻机厂家-合肥沃力数控设备有限责任公司 |