www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Steel Engineering strength bolted connection inspection requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

Steel Engineering strength bolted connection inspection requirements

Time:[2016-3-9]  Hits:4472

Steel Engineering strength bolted connection inspection requirements

High strength bolt friction surface should be smooth, dry, iron oxide surface may not have skin, burr, burr, paint and oil, remove loose rust with a wire brush along the direction perpendicular to the force. And shall not be installed in the rain.

Use a torque wrench should be required to calibrate torque wrench set to respond before the class to be checked before using.

Guangzhou Steel in strict accordance to the surrounding extended from the middle of the order, the early implementation of twist, twist the end of the construction technology program, non-step method of direct final twist. A high-strength bolted joint on bolt group should be central to start the installation, one by one tightening, tighten it again each application are different colors of paint be marked to prevent leakage twist. High strength bolts fastening parts order from stiffness to unfettered free end be carried out from the middle to the edges, so that the adhesiveness between the plates.

Should be free to penetrate the high-strength bolts bolt hole. When reaming, iron may not fall into lamellar. Reaming shall not exceed 1/3 of one joint bolt hole, reaming diameter of not greater than 2 mm aperture together. High strength bolts were forbidden to use gas cutting reaming work.

Guangzhou Steel long-term storage of more than six months or improper care caused by rusty bolts and contaminated dirt, may alter the performance of the torque coefficient or bolts of high strength bolts, as the case should be cleaned, rust and lubrication process, and the torque coefficient or bolt pre-tension test, qualified before use.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日韩手机专区 | 成人福利网站在线看视频 | 美女和帅哥积积对积积 | 在线视频一区二区三区 | 日本免费在线一区 | 天天干天天干天天干 | 香蕉人人超 | 最新顶级人妖shemale网站 | 欧美特黄一级视频 | 成人免费一级毛片在线播放视频 | 性做久久久久久 | 日韩欧美精品综合久久 | 扒开腿让我添个痛快的小说 | 性导航app精品视频 性荡视频在线播放视频 | 日韩欧美一区二区三区不卡视频 | 美女69xxxxx的视频 | 久久香蕉久久 | 高h唔嗯~~np| 色久在线 | 午夜专区 | 久久精品免费i 国产 | 欧美一区二区三区不卡免费 | 亚洲第一色区 | 一级做受视频免费是看美女 | 五月天婷婷色综合 | 在线免费观看a视频 | 俄罗斯胖老太性bbww | 在线视频你懂的国产福利 | missing9韩剧在线观看 | 亚洲精品91大神在线观看 | 91麻豆精品国产91久久久久 | 久草免费福利视频 | 日韩精品视频美在线精品视频 | 免费欧美在线 | 98色花堂最新地址入口 | 欧美一区=区三区 | 日本aⅴ永久免费网站www | 欧美亚洲第一区 | 综合欧美日韩一区二区三区 | 午夜在线日韩免费精品福利 | 在线视频精品播放 |