www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > raw materials and finished steel structure approach
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4914

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 一级性视频 | 色综合中文字幕色综合激情 | 亚洲精品国产福利 | 成人短文 | 色婷婷一区二区三区四区成人网 | 婷婷久 | 多男玩一女的黄暴小说 | 丝袜美腿美女被狂躁在线观看 | 亚洲欧美无人区乱码 | 在线天堂视频 | 男人网站在线观看 | 成人福利在线免费观看 | 日本天天射 | 夜色福利久久久久久777777 | 宅男午夜视频在线观看 | 被老男人开嫩苞受不了了 | 日本青青草 | 欧美性生交xxxxx久久久 | 日韩精品a | 中文字幕第315页 | se视频在线观看 | 久久青草免费91观看 | 欧美一级片播放 | 人流手术操作过程 | 中文字幕日韩在线一区国内 | 一级aaaaaa毛片免费 | 久久久久久久91精品免费观看 | 色www视频永久免费 色www免费视频 | 视频h在线观看 | 一级理论片免费观看在线 | 色天使久久综合给合久久97色 | 在线观看中文字幕第一页 | 中文字幕 二区 三区 搜查官 | 亚洲 欧美 丝袜 制服 在线 | 热伊人99re久久精品最新地 | 欧美综合第一页 | 欧美拍拍| 婷婷月 | 天天看片天天爽 | 日日操视频 | 怡红院免费全部视频在线视频 |