Steel supervision next station control points

Time:[2016-1-20]  Hits:4847

Guangzhou Steel teach you: Steel supervision next station control points

(1) Before the construction supervisors to deal with the approach of materials (steel, high-strength bolts) check, approach the material must have factory quality certificate and sampling site is intended for use after passing inspection, welding rod, wire, flux should meet the requirements .
(2) Check the installation of the production staff of technical welder qualification certificate, so certificates.
Welding income margin, cutting and other allowance and column in compression load deformation value (3) the material according to process requirements, making installation reserved.
(4) member when assembled, to prevent distortions member bagging inaccurate.
(5) welding to adhere to a thickness greater than 50mm carbon structural steel and low-alloy structural steel before welding larger than 36mm preheat hot after welding performed.
(6) the quality of the weld seam inspection in addition to dimensions, surface quality inspection, but also check the internal weld defects, according to the requirements of the drawing to determine the grade of weld quality grade and defects NDT.
(7) Before installing the column, a detailed examination of the relative position of the axis of the anchor bolts and offset.
(8) a single vertical column of steel columns, with one column capitals elevation sections deviations on the wrong port value under the column connection.
(9) Guangzhou Steel steel member during product delivery, product quality must have approval and certification, in order to be sent to the installation site, after installation departments for product acceptance Engineer focused on installation and connection components in place to check on the situation and members steel members connected with the concrete peg holes reservation wear bars.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 青草免费免费观看视频在线 | 操屁网 | 高跟丝袜人妖ts被虐调教 | 青娱乐在线播放 | 亚洲黄色一区 | 亚洲小视频网站 | 伊人精品久久久大香线蕉99 | 综合久久久久 | 91情国产l精品国产亚洲区 | 夜夜揉揉日日人人视频 | 日韩视频在线播放 | 青青草国产成人久久91网 | 中文字幕第二区 | 天堂网最新 | 全黄a一级裸片 | 做受又硬又粗又免费视频 | 9久热久re爱免费精品视频 | 五月婷婷综合在线视频 | 正在播放麻豆 | 久久久久久久99久久久毒国产 | 综合久久久久 | 日本三级成人中文字幕乱码 | 香蕉漫画基地成人 | 色综合五月 | 四虎影视国产884a精品亚洲 | 日本一道dvd在线播放 | 亚洲欧美中日韩中文字幕 | 欧美视频在线免费播放 | 有啥免费毛片呢 | 乱码卡一卡二卡新区在线 | 久久99久久99精品免观看不卡 | 欧美一级特黄aaaaaaa在线观看 | 一级毛片女学护士 | 久久精品久久精品国产大片 | 日日拍夜夜嗷嗷叫狠狠 | 蜜臀91精品国产免费观看 | 99热福利| 免费一级欧美大片视频在线 | 久草视频在线首页 | 综合久色 | www.欧美精品 |