Steel Construction Safety Control handle inquiry

Time:[2015-9-30]  Hits:5357

Guangzhou Steel News: Steel Construction Safety Control handle inquiry

Followed by the development of society, from the steel works is increasingly being recognized economic, practical, seismic, in use, etc., followed with an increase in steel works, steel in construction, production safety questions more outstanding. Steel Construction site safety handle though complicated, but as long as we can to strengthen the control and inspection for the main part of the construction process, so fine, standardized handling, I believe we will be able to ensure the smooth construction of production, orderly and safe conduct .

First, the question of protection analysis and research limb, hole, high job

1, in order to lay the pressure plate, reducing limb, the onset of the hole pressure plate laying steps rubato, adjustment, riveted, laying order starting from the side of the starting point should be laid to the surrounding continuous, that reduce limb, The attack also eliminates the need for hole secure channel (in the main beam and pillars of the seam welding, weld appearance processing, ultrasonic testing, several processes up paint job, only in the middle of each of the axes laid together by two scaffold boards makes up the secure channel) laying process. Before laying operations should be laid beforehand hanging over the bottom layer of the pressure plate level safety net, rubato, the adjustment should wear seatbelts, Staking should promptly adjust the pressure plate riveted good good, requiring plank and riveting synchronized springboard shall not leak or riveting riveting, riveting and prevent leakage episodes apron phenomenon.

2, limb, hole protection. Of the elevator shaft on the floor or ground plane, tube wells and the surrounding floor and sides of the hole grew to 1.5m surrounding scaffolding pipe erection height of 1.2m protective railings, entrance Hangings retardant safety net level. Railing plug located retardant Fine Mesh Legislative Network. Length was longer than 1.5m hole, lift wellhead, should be changed every two Hangings retardant safety net level (ground floor flat on the ground covered with fire-retardant medium dense mesh safety net). Hole, limb protection to ensure the safety of operating personnel, within the hole to prevent the upper level of the network played a material role of junior officers hurt falling. Guangzhou Steel

3, high job protection measures: First Parachute. To prevent falling height, the operator during the height job, it is necessary to use seat belts. Since the steel construction activity when a larger range, use an ordinary seat belt is difficult to meet the construction requirements, should be used with a speed difference from the controller (also known as anti-dropping speed difference or anti-dropping device or buffer) belts. When lifting steel columns and apparatus, in order to ensure that workers removed hoisting rope used in a safe state, by hanging hook safety rope at a height determined in accordance with the site, for hanging safety belt safety catch. When people climb steel ladder, use self-locking device Dropped solve unprotected steel ladder doubt. Self-locking device use should be careful not to hold against; when people climbing, self-locking device is always with fellow construction workers. It is necessary to seat belt hanging on the hook safety catch to prevent the onset of fall accidents. Second, beams, safety rope hanging on steel columns. After more than two fixed solid steel columns, it is necessary to set up safety rope pull (or coarse coir rope) in order to fasten the seat belt hanging. Φ6mm rope hanging on steel beams, suspension height 1.2m, erected at intervals of not less than 1.2m 3m high of 70mm × 70mm × 7mm used to support the safety rope, and the choice of basket bolt tensioning the safety rope, safety rope to prevent excessive due to security failures. When workers walking on the beam, with the necessary security safety ropes hanging. Third, the steel ladder setting. Temporary lifting with ladders, choose 70mm × 70mm × 7mm do ladder support, the use of M14 bolts angle is fixed on steel columns, use 40mm × 4mm flat steel ladder handrails do, do with a 14-round stepladder, ladder width should not be less than 40cm, it is necessary to connect with the steel columns solid, stable, can not shake. Fourth, operating platforms. When the steel beams and support devices, the main girder parts hanging rope security personnel will guard the seat belt hanging rope walking. Steel columns segmenting means. Docking, when the bolt, in order to ensure safe operation of the workers, in the first paragraph of the steel columns from 1.2m at the top of the column erected platform. Site construction schedule based on the number of platforms to determine and ensure the normal turnover, does not affect the lifting operations. Setting means operating platform for welders to create a good working environment, to ensure the safe operation of the welder. The platform disassembly convenient, safe and reliable, to steel columns docking device, calibration, weld appearance processing, ultrasonic testing and other processes to provide a safe production security.

Second, the material lifting, hoisting questions Analysis and Research

1, means the use of things such as a torque wrench, crowbar, grinder, etc. should be used in safety rope to prevent falling. Readily with bolts and gaskets should be placed in bags of stuff.

2, applied to all jobs in industry, perhaps falling objects should be removed or to be fixed.

3, in the high altitude cutting gas cutting or welding, should take measures to prevent cut metal, bead or sparks falling wounding.

4, in the process of lifting and means, first check the rigging, wire rope, hook is solid, you want to choose a suitable hanging points before lifting, if found unsafe should immediately suspend construction danger to the relevant personnel.

Third, Hot Work Analysis and Research

1, according to the requirements of the two groups with flare when effective fire extinguisher, let someone see the fire, then use spark bucket underneath.

2, oil can not hand contact with oxygen bottles, to prevent the crane or other mechanical oil fell on the oxygen cylinder.

3, oxygen and acetylene bottles necessary to regulate placed above the cylinders set quarantine measures to prevent the ignition of the gas cylinder when the cross-operation. It is necessary to have anti-tempering equipment, electrical welder strictly enforce safety rules when using acetylene bottles.

4, welding operations with Cradle hang provided on the main beam wing pendant. Welding operator seat belt safety rope hung, you can rest assured welding. This hanging basket hanging demolition convenient, safe, reliable, versatile, high-strength bolts it to a final twist, weld appearance processing, ultrasonic testing and other processes to provide a safe production security.

5, then the use of spark fighting. In order to prevent accidents and fires caused by scalding attack sparks of welding and cutting, it is necessary to set up high-altitude welding sparks fight then, using rockwool fire-retardant materials inscribed spark fighting then melt beads, bead prevent splashing out again energize plate .

Fourth, the construction of steel structures means that other safety measures Analysis and Research

Strict implementation of safety devices handle steel construction systems and safety procedures, standards, norms, and do all the security measures to crack "Sambo, four" protection. Strict implementation of the provisions of the safe use of electricity. Erection of scaffolding aerial work safety, safety fence and safety nets for protection, workers necessary to wear seat belts. Steel construction lifting equipment work area should be set up alert line, as a clear sign, and let someone serve. In addition to the safety rope hanging on steel beams, steel columns outside, in limb protection in the floor when not kept pace with the limb, the hole to set the alert line of red and white, and set up warning signs in the limb at the floor (height operation it is necessary to hang up the seat belt or safety slogans, etc.). Non-construction personnel hoisting operation is prohibited into or through lifting area. Trial before the formal lifting cranes, lifting equipment inspection job situation, ropes, anchor points. After confirmation, before the official lifting. Smooth lifting action, when more than one hoist operation together, start aborted concerted action to prevent the workpiece vibration and swing. After leveling the time to find a positive place, the work can not unlock fixed before hoisting rigging. Finds it necessary to suspend the lifting process, it is necessary to take safety measures, and enhance on-site guard, troubleshooting as soon as possible, so that the workpiece can not be a long time in a suspended state. Participate steel apparatus construction hoisting personnel necessary to stick to their posts, obey the command to listen to the unified command, to not immediately clear signal should ask, non guesswork operation. Field staff positions necessary to have the necessary knowledge of lifting, and familiar with the relevant regulations and codes. The main component lifting should be done in the morning, the other lifting operations should be carried out during the day, at night to prevent the job. Night work is necessary to have adequate and reliable lighting. Wind prohibited in four and four more were lifting, rain and snow can not be carried out lifting operations. When hoisting steel apparatus construction, construction workers below the workpiece can not, force a nearby rope and other dangerous places to stay. No person shall when lifting or hoisting equipment lifting of the workpiece, along with special circumstances when it is necessary to lift, it is necessary to adopt reliable safety measures and approved by the relevant responsible person. Member hoisting should fitters, electricians and other lifting equipment as protection equipment, cut off the power to suspend operations should ensure. All steel construction means construction workers necessary to wear safety helmets, aerial work necessary to have seat belts. Do not drink and steel industry means jobs and production facilities whim, forced prohibited illegal operation. Guangzhou Steel

V. Conclusion

As the steel project has the full in the construction process, the whole process around the clock in a highly dangerous state of the hole, limb, like height operation; professional construction workers and engineering staff are at the height of the handle intensive interchange work environment ; the whole engineering components and construction equipment, materials and various safety features of the equipment and materials required special hoisting, lifting, etc., to bring it difficult to handle the construction safety. Therefore, strengthening the construction of steel safety handle is particularly important.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 珠海拾比佰彩图板股份有限公司 | 微EAM - EHS安全管理系统-设备管理系统-设备全生命周期管理软件-HSE安全管理软件 | 久久91精品久久91综合_国产亚洲自拍一区_国产精品第1页_亚洲高清视频一区_91成人午夜在线精品_亚洲国产精品网站在线播放_亚洲国产成人久久综合区_国产精品亚洲专区在线观看_免费视频精品一区二区三区 | 联想南京总代理-联想服务器|联想电脑笔记本代理商|联想工作站|dell服务器|HP服务器|南京IBM代理商|IBM V5000存储总包销-南京宇宽科技有限公司 | 首页|YULI玉立专业厨房电器官网|集成灶十大品牌 油烟机 燃气灶 | 桐城_池州_枞阳_黄山_潜山_东至挖掘机租赁-安庆光兴机械租赁有限公司 | 紫外线光疗仪|白癜风光疗仪|牛皮癣治疗仪|308纳米led|SIGMA|上海希格玛高技术有限公司 | 墙板_户外墙板_ASA共挤户外墙板-康亿家生态木业集团 | 排水PVC管-PVC排污管-给水PVC管-电线PVC管-米阳建材pvc管厂 | 一体式电磁流量计_分体式电磁流量计_卫生级电磁流量计_卫生型电磁流量计_电池供电电磁流量计_卡箍式电磁流量计_废水电磁流量计_德克森仪表(淮安)有限公司官网 | 上海舜华新能源系统有限公司_官网 | 生物质蒸发器_燃气蒸发器_燃气锅炉价格|厂家直销-山东泰锅锅炉设备有限公司 | 基坑护栏,临边护栏网,爬架网,爬架网片,铁路防护栅栏,公路护栏网,河北昊坤金属制品有限公司 | 膜结构车棚厂家-张拉膜景观棚-汽车充电桩停车棚-嘉兴铭邦膜结构公司 | 中山四海家具制造有限公司| 悬挂式小鼠笼架,植物标本采集箱,昆虫标本盒厂家-北京合力科创科技发展有限公司 | 山东洗地机_工业洗地机_驾驶式扫地机_扫地车厂家_鼎洁盛世官网 | 自动隔油提升设备,消防稳压一体设备,苏州不锈钢消防水箱,污水提升设备厂家,无负压变频供水设备厂家-苏州脉泉供水设备有限公司 | 南通市科脉电子科技有限公司| 衡水一体化污水处理设备|循环水旁滤器|加药装置|钢厂浊环净化装置|河北欧意科技集团有限公司 | 郑州邦达电气有限公司| 张家港起重搬运吊装,工厂设备搬运服务-张家港易源起重搬运有限公司 | 河北安润防腐管业股份有限公司-远程供液管路_远距离供液管路_远程供液系统 | 吸污车|吸粪车|冷藏车|消防车|清障车|环卫垃圾车价格|湖北程力汽车集团厂家销售公司 | 南京消防申报公司-江苏国消设备安装有限公司 | 行李快递安检机-便携式X光安检仪-行李安检机-液体-爆炸物探测仪-安天下安检设备 | 山东啤酒箱塑料提手_注塑产品加工_手提绳厂家-淄博浩晨包装制品有限公司 | 天津市金色巨腾科技发展有限公司-天津监控安装,天津弱电工程,天津无线网络覆盖 | 长沙物流公司|湖南货物运输公司|长沙第三方物流公司-国联物流 湖南第三方物流专家 | 耐力板厂家_pc耐力板价格_透明耐力板批发-佛山市麦粒建材有限公司 | 塑胶篮球场施工|塑胶网球场施工|幼儿园塑胶施工|石家庄亚强体育公司 | 专业无机盐,化工产品检测公司,水处理剂检测公司,第三方水质检测机构—准诺检测 | 实验室实验台-钢木实验台-实验室通风柜-实验室家具-苏州奥纳威 | 深圳市新纶超净科技有限公司,防静电/洁净室行业系统解决方案提供商 | 全自动滤水器_射水抽气器_气液两相流疏水器-连云港神美电力辅机有限公司 | 溶气气浮机_一体化净水设备_污水处理设备_mbr一体化污水处理设备-明基环保 | 日本国际高中学校招生【立学仕日本留学服务】日语中学学校|美术生|艺术生|高中生|本科|研究生|语言学校留学择校申请 | 挖掘机|小型挖掘机|挖掘机抓木机|轮式挖掘机|宝鼎挖掘机-宝鼎液压机械公司厂家直销 | 主题公园设计|主题公园规划|水上乐园设计|龙翔设计|龙翔景观|龙翔文旅|深圳市龙翔设计景观工程有限公司 | 五凌汽配-轮胎螺丝|中心螺丝|小螺丝|轮胎螺栓|扭力杆螺丝|高强度紧固件|螺丝螺母|汽车配件 | 上海眼科医院_上海希玛瑞视眼科医院【上海医保定点单位】 |