www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Guangzhou Steel specify the contents of the convergence of high strength bolts
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

Guangzhou Steel specify the contents of the convergence of high strength bolts

Time:[2015-5-20]  Hits:4725

Guangzhou Steel specify the contents of the convergence of high strength bolts


1, anti-slip coefficient is one of the main planning parameters of convergence of high strength bolts, directly affect the bearing capacity member, and therefore member friction surface treatment regardless of the manufacturer, or by the on-site treatment should be tested against the slip coefficient measured anti-slip coefficient planning requirements of this section shall comply with the minimum mandatory provision.
In the field portion of the device chosen grinding wheel friction surface, grinding range of not less than four times the bolt aperture, grinding direction should be perpendicular to the direction of the force member.
In addition to planning the choice of friction coefficient is less than equal to 0.3, and clearly may not be anti-slip coefficient test persons, the rest of the production situation in order to determine the processing method of the friction surface, you must press the required quantities and by three sets of the same material, the same processing method The specimen retest. At the same time along with three sets of the same material, the same specimen processing method for the device before the reinspection.
2, high strength bolts final tighten 1h, missing bolt pretension has been largely concluded, in the next one or two days, losing stabilized, after more than a month, the loss will stop, but in the external environment, bolts torque coefficient will change, affecting the accuracy of the inspection outcome. In order to unify and ease of operation, this provision must end at the same time checking within 1h after 48h.
3, the structure of this section refers to the planning reason reason causing space is too small to use a dedicated end wrench tighten conditions in torsional shear type high strength bolts of construction, because device sequentially, means the direction of ill-considered, or twist at the end because of the electric wrench to grasp the unskilled. Resulting in a final twist when the tail end of the ridge head Plum slip teeth (ie slip), you can not twist off the plum head, resulting in a final twist torque is unknown. Should be controlled to a certain percentage of these bolts.
4, the beginning of high strength bolts screwed screwed for the purpose of re-friction surface energy of tight and uniform bolt stress, focusing on large node node device order to prevent the loss of pre-tension bolts uneven impact of the convergence of stiffness.
5, forced penetration will damage the threaded bolt, changing the convergence deputy high strength bolts torque coefficient, and even the nuts are not screwed on, so focus on the freedom to penetrate bolt holes, gas cutting reaming very rules, both impair effective member carrying surface, reducing the pressure force transmission area, but also to cause defects reaming at the steel, it shall not gas cutting reaming, reaming maximum limits on the amount is based on the effective load transfer surface member and the friction force area of ​​consideration.
6, for bolt-node grid, its stiffness (deflection) are often weaker than planned value, an important reason is because the ball and the steel bolt tightening is not strong convergence of high-strength bolts, a gap, loosening not tightened conditions, the current portion After removal of the support system, due to the convergence gap, loose and other reasons, deflection significantly increased, exceeding specification limits. Guangzhou Steel

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 有啥免费毛片呢 | 青青草原伊人网 | 亚洲天堂免费看 | 一区二区三区视频在线观看 | 天天射夜夜操 | 性欧美大战久久久久久久 | 中文字幕亚洲综合久久男男 | 探花2700视频| 伊人精品视频一区二区三区 | 五月婷婷操 | 青春草在线视频观看 | 五月天色婷婷丁香 | 女友闺蜜真湿夹得我好爽小说 | 亚洲国产精品成人午夜在线观看 | 青草视频在线观看免费网站 | 一卡二卡三四卡高清视频在线播放 | 2020伦韩国理论片高清 | 欧洲亚洲综合 | 人间流放者星河蛋挞免费阅读 | 亚洲成a人片在线v观看 | 婷婷综合久久狠狠色99h | 亚洲成a人v大片在线观看 | 91视频国产91久久久 | 日韩精品亚洲精品485页 | 伊人55影院| 欧美在线看欧美高清视频免费 | 草草浮力影院第一页入口 | 久久多多屋影院三级 | 特级淫片欧美高清视频蜜桃 | 久久天天操 | 青春草在线视频免费观看 | 夜夜伊人 | 日本大肚孕交japanese | 欧美在线观看视频网站 | 色婷婷99综合久久久精品 | 特级做a爰片毛片免费看 | 日日夜夜精品免费视频 | 免费看韩剧 | 日日麻批的全部过程 | 日日夜夜伊人 | 日本免费观看日本高清视频 |