1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:4898

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美人与牲动交xxxx小说 | 在线激情网 | 色www亚洲| 91久久九九精品国产综合 | 日日噜噜夜夜狠狠久久丁香 | 2021国产成人综合亚洲精品 | 亚洲日韩中文字幕在线播放 | 天天天狠天天透天天制色 | 日日天天| 一级交配 | 在线视频成人 | 四虎在线永久 | 性刺激免费视频观看在线观看 | 天堂伦理 | 日本 韩国 三级 国产 欧美 | 日韩一级黄色 | 色资源网 | 巨乳色网址| 午夜在线观看免费视频 | 日本一本久 | 中国人xxxx | 日本色站| 1024视频污 | 天天av天天翘天天综合网 | 久热这里只有精品在线 | 一个人看的bd小说观看 | 中文字幕在线观看网站 | 99久久久精品免费观看国产 | 免费看男人添女人下面视频 | 五月综合久久 | 99香蕉视频 | 日韩美女在线观看 | 一区二区欧美视频 | 日韩在线www | 中文字幕激情 | 一个人看的www免费高清视频 | 四虎永久在线精品国产 | 我要看一级黄色毛片 | 在线免费观看资源高清 | 日本a级片免费观看 | 荡女淫春护土完整版在线观 |