Steel works construction schedule control content

Time:[2014-11-15]  Hits:5488

(1) pre-schedule control include: steel structure engineering controls to determine the construction schedule of work content and features, control methods and specific measures to achieve the objective analysis of the progress of risk presented problems to be solved; in accordance with the contract period, the construction schedule objectives and project staging production requirements of the construction preparation work and the timing of the construction tasks to determine the interface between the various units of construction engineering, engineering jobs and full-site engineering; the use of water construction principle, segmental construction of scientific organizations to achieve three-dimensional and assembly-line plane, while the application of network planning techniques, the preparation of the implementation of the local network plan, according to a key line of work to achieve continuity and balance construction; construction works in the project schedule as the basis of the total annual projects, identified steel the image of progress and structural engineering resources required (including manpower, material resources, materials, equipment and funds, etc.) supply plan.
(2) the matter of schedule control include: the establishment of the progress of implementation of the system construction steel structure engineering controls; timely construction progress inspection, make a record, keep abreast of the progress of the implementation of dynamic; the progress of data collection and statistical collation, and with compared schedule, which found that if there is progress and the progress of the deviation predicted feasible modifications measures; readjust schedules and related plans and implementation; enhance on-site construction management and scheduling, timely prevention and treatment occur in construction technical issues, quality incidents and accidents, reduce the impact of these issues on the schedule.
(3) after the schedule control include: the timely acceptance of tissue engineering, process engineering claims, project progress data compilation, classification, cataloging and archiving and so on.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 吊逼网站| 一区二区不卡在线观看 | 福利片在线播放 | 欧美一卡二卡三卡四卡 | 午夜三级在线观看 | 男人天堂亚洲天堂 | 男男gaychinese| 日韩欧美一区二区中文字幕 | 日韩福利视频高清免费看 | 欧美一区二区三区激情视频 | 最近中文字幕无免费视频 | 天堂资源在线www中文 | 免费大片看黄在观看 | 日本一区午夜爱爱 | 自拍偷拍2019 | 女人被男人靠到爽完整视频 | 99re国产精品视频首页 | 五月天丁香在线 | 色婷婷啪啪| 一区视频在线观看 | 日韩欧美一区二区三区不卡在线 | 91麻豆精品国产91久久久久 | 99久久免费国产精精品 | 亚洲94vvv男人的天堂五月 | 亚洲最新在线观看 | 4虎最新网址 | 欧美另类丰满69xxxxx | 六月婷婷开开放处 | 日韩第3页| xxxx日本护士人妖 | 欧美一级免费观看 | 啪啪导航 | 日韩毛片免费观看 | 久热这里只精品99国产6_99 | 一道本在线 | 一本大道加勒比久久综合 | 欧美视频区| 亚洲国产欧美在线人成精品一区二区 | 天天插天天透天天狠 | 天天天夜夜夜 | 三级视频在线观看 |