www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Mixed steel installation drawings and design changes
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:5250

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日日天干夜夜人人添 | 亚洲乱码一二三四区国产 | 四虎影视久久 | 青春久久 | 日本中文字幕第一页 | 综合亚洲精品一区二区三区 | 久久精品99精品免费观看 | 日本韩国高清 | 亚洲另类图区 | 日韩激情视频 | 99久久久国产精品免费播放器 | 免费国产一区二区三区 | 暖暖免费高清日本一区二区三区 | 日本高清视频成人网www | 青草免费免费观看视频在线 | 亚洲欧美日韩国产 | 天天狠狠色综合图片区 | 中文字幕精品一区影音先锋 | 草莓视频无限在线看网站 | 性生生活三级视频观看 | 在线播放免费视频 | japanese西装黑袜gay网站 japanese老年人同性gay | 欧日韩美香蕉在线观看 | 99精品国内不卡在线观看 | 婷婷啪啪| 9久热久re爱免费精品视频 | 99热这里只有精品国产动漫 | 欧美性战| 亚洲最新中文字幕 | 亚洲欧美日韩中字综合 | ai换脸女明星被躁在线观看 | 四虎最新永久在线精品免费 | 亚洲欧美日韩一级特黄在线 | 边摸边吃奶边做好硬好深 | 我想看一级播放片一级的 | 一级片免费观看视频 | 欧美在线看片 | 人人网碰人人网超 | 粗黑巨大狠狠挺进 | 亚洲精品综合在线 | 97色伦图片97综合影院 |