www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > The advantages and disadvantages of building steel plant?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

The advantages and disadvantages of building steel plant?

Time:[2014-7-26]  Hits:5240

Advantages and disadvantages of steel construction plant?
Foshan Steel Advantages
1, widely use: apply to factories, warehouses, office buildings, stadiums, hangars and more. Both for single-large-span construction, can also be used to create a multi-or high-rise construction.
2, the construction of simple, short construction period: All components are prefabricated in the factory is completed, simply assembled on site, thus greatly shorten the construction period, a 6,000 square meters of construction materials, just 40 days to complete the basic unit.
3, durable, easy to maintain: General Computer designed steel construction can resist harsh weather, and simply maintenance.
4, beautiful helpful: Steel construction clean lines and smooth, with a modern feel. Colored wall panels have a variety of colors to choose from, other materials may also be wall, and therefore more flexible.
5, the cost is reasonable: steel construction, light weight, reduce the cost base to create fast, can be put into operation as soon as possible, much better than the overall economic efficiency of the construction of concrete structures.
Shortcoming
An analysis of the quality of Foshan Steel Works attack doubt
Steel is difficult to guarantee the quality of the project for many reasons, but also very complex, both technologies resulting in improper questions, there are also questions about the formation of violation of technical operations, as well as a sense of responsibility because of technical standards and construction workers to form questions, as well as decision-makers quality doubt mistakes formation.
(A) doubt their existence steel
A unit of a building in the processing box columns 1200 * 1200 * 60 in the welding process appeared as suddenly found 60mm thick web of tear appearance, clearly visible crack the board, from the thickness direction of the two bonus half the depth of the crack by NDT inspection found at a depth of about 3mm attack, while another of the same type from the same batch of plates cut a few parts, it was discovered in the mezzanine board memory, rolling doubt the quality of poor quality is the main form the reason. Because the welding process of welding the welding stress episodes opened the sandwich material. Thus there tearing in the thickness direction of the plate appearance.
Analysis: Because of the use of particular parts of the web as in the component parts used in the longitudinal direction of the upper and lower parts of welding in the welding formal opening of full penetration groove force of stiffeners, because the existence of an internal board layered, welding welding stress episodes released thus torn out sheet in the thickness direction.
Can take the following measures to deal with several of the actual situation:
(1), mezzanine exist within a large steel mills belonging to the onset of their quality in the process of rolling doubt, has gone beyond the requirements of national standard specification can send requests to verify mills, steel mills in consultation with the return or exchange cargo handling;
(2) If the number is less sandwich technology sector and the owners can seek advice, information feedback to the steel mills, the construction of the emergence of doubt take remedial measures, according to the results of non-destructive inspection in doubt, the site uses gouging All dig beyond their depth with equal strength and weld filler material, the outer end of the treatment, after a predetermined time for NDT inspection, while the samples for the same members, physical testing, design specifications can reach continue to use;
(3), under the supervision of the parts cut off the witness again to meet the conditions put on the plate, replaced parts for non-load-bearing and non-critical parts or as an auxiliary use, after the prescribed time after the completion of perform NDT inspection, make a record.
(B) appear in the construction process in doubt
Manufacture process easier to attack the quality of questions and deal with it very difficult after the onset of the main processes and is particularly important process. General questions about the quality of processes episodes proportion is small. During the construction process of the above, in particular processes have welding, painting, an important step has cutting and installation.
1, the welding process. The processes are hidden works, one of the most easy to attack the quality of processes in question, from 2004 to a company's product quality report statistics show that the onset of the quality of questions in the process: because, as the quality of welding seam resulting in failure rates as high as 80 % or more, followed by questions about the procedure because of technical and operational personnel improper operation, which results in about 10% of weld quality questions, such questions are the main questions directly impacts the quality, quantity, so this type of questions must be professional check the companies use specialized tools to be able to check to check, judge it, generally based on the type of weld defects into the slag, not fusion, such as porosity.
2, the coating process. The process also belongs hidden processes, the impact of construction on the structure function is less than. Quality is also easier to attack questionable processes. The main questions about the quality of process table now: exterior paint large drop and local components falling, falling film component appearance, seizures sagging appearance, insufficient film thickness, film thickness spread unevenly, film color color large.
3, lofting cutting processes. Before this process belongs to the leading members before processing, the quality is good or bad for the next process there is a direct impact, and even cause the entire cutting scrap parts, episodes of this situation is very common, so the next feeding for strengthening the process of quality control is very important and necessary. The onset of the quality process now doubt the main table: For long and thin type of cut parts in the deformation ratio than ferocious; since cut gas or plates inside presence and composition of the slag, which results in the spread unevenly cut surface appears horse teeth pattern, nodules, deep cut marks over norms; gas cutting or sawing parts shrink and does not consider the follow-up process, the shape and size of components resulting in excessive; because of mistakes in the preparation of technical documents, which results in zero bulk parts scrapped; cutting the size of the cut beyond the grave specification requirements.
4, the installation process. The quality component machining process occupies an important position in its quality greatly influenced by the procedure, so before installing strengthen the monitoring process is very important. The process of attack, the main questions about the quality of the table now: orientation of fault parts installed, such as pretending to 3450mm 4350mm; components using fault, should have been installed 2 # components parts, installation is another part # 3; zero component mounting fault in the correct orientation, such as holes originally outwardly board 45mm, 45mm and the actual contents of the South; void mounted components installed beyond technical specifications and documentation requirements, 3mm gap, 7mm; some zero components are not installed by correcting it, after the installation is complete distortion exists no way to eliminate distortion; operatives privately easy way to cut a hole the size of overweight position on the part; assembly and welding area is not a table, surface treatment; since the paper size fault installation fault formation.
(C) the use of questions
Because the steel plant does not regulate the use of foam, some manufacturers in order to save costs, with the lowest non-flame-retardant materials as fillers, resulting in a fire steel plant personnel can easily attack caused casualties.
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 山东宇帆航空科技有限公司官网 | 深圳LED显示屏厂家_室内户外LED显示屏_彩屏电子有限公司 | 消防安装_消防安装施工_消防施工_北京消防安装公司-亿杰(北京)消防工程有限公司 | 清河县隆鑫密封件有限公司,汽车用密封条,配电箱柜、集装箱密封胶条,建筑门窗、家具用密封条,无毒环保医用密封条,船舶、农机用密封条,异型产品 | 伸缩机厂家-现货快递物流伸缩皮带机|装车输送机-乐清市华森自动化设备有限公司 | 联系我们果博东方在线开户客服电话:19038688886 - 黑龙江旺广机械设备有限公司 | 监控工程,安防监控公司,北京监控安装,北京安装监控,安装摄像头,北京监控维保,监控施工,北京监控维修,监控弱电工程,监控器安装,监控维护保养,监控工程设计,北京监控设备维修,监控报警安装,北京北方合力科技有限公司 | 重庆消杀公司-重庆斗哥环保科技-灭鼠公司-重庆灭蟑螂-除四害-灭老鼠-灭虫-重庆灭白蚁公司 | 气体灭火安装,气体灭火系统安装,七氟丙烷灭火系统安装,消防气体灭火控制系统 | 九江市云山油茶科技发展有限公司| 易居房产律师网|北京房产律师|房产纠纷律师|房产律师 | 合金锤头_破碎机锤头_耐磨锤头_巩义市东辰铸造 高耐磨合金锤头厂家 | 苏州空气压缩机-无油涡旋空压机-真空泵价格-变频空压机-苏州赫利亚斯气体技术有限公司 | 上饶市新达新包装材料有限公司| 青岛相控阵检测_无损探伤检测机构_相控阵超声检测公司-青岛发现检验技术咨询 | 水质在线硬度计-立柜式五参数水质分析仪-上海博取 | 提供技术支持-TXC晶振-晶振厂家-32.768K,石英晶体振荡器厂家销售-NDK振荡器正规代理商 | 重庆吊篮租赁-重庆脚手架租赁-重庆斌盛机械设备租赁有限公司 | 名嘉宴会【官网】_宁波冷餐_宁波茶歇_宁波酒会_宁波自助餐_宁波盛世名嘉宴会服务有限公司 | 金蝶软件_金蝶湖南公司_长沙金蝶软件_精斗云软件_财务软件_进销存软件_云ERP软件_金蝶软件销售电话 | 湖南视频会议设备厂家|长沙视频会议设备安装型号齐全找湖南日恒智能工程有限公司 | 重庆惠程信息科技股份有限公司| 营销型网站建设_网站设计_网页制作_找北京恒基建网站公司 | 爬架网@建筑爬架网@冲孔建筑爬架网片@工地冲孔建筑爬架网片@工地冲孔建筑爬架网片厂家@工地冲孔建筑爬架网片生产厂家-安平县诺德金属制品有限公司 | 麦秸映像网络技术有限公司,河南省政府采网入驻对接,新乡网站维护建设,小程序开发,APP定制开发,钉钉开发,新乡软件开发等相关网络业务 | 潍坊晨硕机械设备有限公司 | 暖气片-工程暖气片厂家【专注工程暖气片30年】-北铸暖气片 | 易众拍卖行-事故车拍卖,残值车拍卖,水淹车拍卖,全损车拍卖,修复车拍卖,碰橦车拍卖,瑕疵车拍卖,报废车拍卖,泡水车拍卖,拆车件拍卖,配件拍卖,火烧车拍卖,二手车拍卖专业线上平台 | 滤布_PP滤芯_过滤芯_线绕滤芯_碳纤维滤芯 - 东莞市三比过滤器材有限公司 | 找网页游戏鬼服 高返利鬼服游戏平台 鬼服开服表 - 猫游戏鬼服大全 | 化工招聘网 化工人才网|化工英才网-化工企业招聘首选网站 | 郫都人才网_郫都招聘网_求职找工作平台| 面粉加工设备-面粉加工机械-面粉机组-面粉磨粉机-面粉机成套设备-河南粮院机械制造有限公司 | 上海况胜_玻璃反应釜厂家_双层玻璃反应釜_实验室玻璃反应釜 | 无锡亮鑫不锈钢有限公司-不锈钢炉胆,马弗炉胆,耐高温炉胆,310s炉胆,网带炉 | 喷淋清洗剂,铝合金清洗剂-青岛爱大生环保科技有限公司 | 千斤顶-超薄电动千斤顶-电动液压千斤顶-液压螺母扳手-泰州杰克液压机械制造有限公司 | 实验升降炉-箱式管式炉- 台车真空炉-熔块旋转炉-推板隧道窑-洛阳鲁威窑炉有限公司 | 南通众诚数控机床有限公司-液压机,剪板机,折弯机,卷板机,液压冲床,路灯杆设备专业制造商 | 亚克力游泳池_透明/空中/无边泳池_别墅亚克力泳池设计生产厂家_瑞地格乐-深圳他拍档 | 黑料网 - 黑料大事记-黑料门 黑料社最新 今日黑料 热门黑料 最新反差免费-黑料网今日黑料首页_黑料网 - 黑料大事记-黑料门 黑料社最新 今日黑料 热门黑料 最新反差免费-黑料网今日黑料首页 |