Key control points for steel structure engineering supervision work

Time:[2023-8-16]  Hits:1661

01

 

Qualification review of construction units

 


Due to the strong professionalism of steel structure engineering, there are high requirements for professional equipment, processing sites, workers' quality, as well as the construction technology standards, quality assurance system, quality control and inspection system of the enterprise itself. Generally, it is mostly subcontracted under the general contract. In this case, the qualification and management level of the construction enterprise are quite important. Therefore, qualification review is an important link, and its review content includes:


(1) Whether the construction qualification and business scale meet the engineering requirements. (2) Whether the construction technical standards, quality assurance system, quality control and inspection system meet the requirements of engineering planning technical indicators. (3) Inspect whether the production capacity of the construction enterprise meets the requirements of the project schedule.

 

02

 

Review of Welder Qualifications

 


Welders must pass the exam and obtain a certificate of qualification, and certified welders must perform welding on their approved projects and scales. (1) Number of views: All views (on-site personnel). (2) Inspection method: Check the welder's qualification certificate, its recognized scale, and validity period.

 

03

 

Drawing review and technical preparation

 


According to the drawing review procedure in the supervision plan, understand the drawings before the start of the project, convene and preside over the drawing review by professional technical personnel from the planning, owner, supervisor, and construction unit. Based on the planning documents and related materials and standards, address any errors, omissions, irrationality, non compliance with standards, and national construction documents in the construction drawings before construction. Coordinate with the owner, planning, and construction units to determine specific treatment measures or plan optimization for drawing issues. Urge the construction unit to organize the minutes of the joint review, and distribute them to all units after all parties sign and stamp them.

 

04

 

Review of construction organization planning (plan)

 


(1) Urge the construction unit to prepare a special construction organization plan (plan) in accordance with the construction contract. After approval by its superior unit, it shall be reported to the supervisor. (2) After review, if the construction organization plan (plan) needs to be changed during construction, the reason and content of the change must be reported to the supervisor and the construction unit for review and approval before the change can be made.

 

05

 

Regular meetings

 


Organize and participate in a weekly construction site meeting jointly attended by the construction, construction, and supervision units to promptly solve construction problems.

 

06

 

Key points for specific control of steel structure engineering preparation work

 


(1) According to the Unified Standard for Construction Quality Inspection of Building Engineering GB50300-2013 and the Standard for Construction Quality Inspection of Steel Structures GB50205-2020, as a sub project, it is divided into sub projects such as steel structure welding, fastener connection, steel parts and steel component processing, steel component assembly, steel structure pre assembly, steel structure device engineering, profiled metal plate, steel structure coating, etc Regarding the raw materials of steel structures (including steel, welding materials, coating materials, etc.), they have a significant impact on the quality of steel structures and are separately included in the steel structure standards.

(2) Check the welder qualification certificate, its recognition scale, and validity period.

(3) The construction party shall conduct welding process evaluation on the steel, welding materials, welding methods, welding heat treatment, etc. used for the first time, and determine the welding process based on the evaluation report. The supervisor has reviewed all the welding process qualification reports and reviewed them according to the planned weld quality level standards. (4) Before installing steel components, check the positioning axis (bay size and span size) and elevation of the building, as well as the standards and fastening of embedded parts, which should meet the planning requirements. (5) When the embedded steel plate on the reinforced concrete bracket top of the engineering column is directly used as the bearing surface of the steel component, the allowable error in the position of the embedded steel plate on the bearing surface should comply with the standard regulations. (6) Steel components should comply with planning requirements and the provisions of this standard. The deformation and coating detachment of steel components caused by transportation, stacking, and lifting should be corrected and modified. (7) The supporting surface of steel components should not be less than 70% of the contact surface between the top and the embedded steel plate surface, and the maximum gap at the edge should not be greater than 0.8mm. (8) Before painting, the surface of the steel should be embroidered in accordance with the planning requirements and current national standards. The treated steel surface should not have welding slag, welding scars, dust, oil stains, water, and burrs. (9) The coating, number of coating passes, and coating thickness should all meet the planning requirements, with an allowable error of -25mm. The allowable error for each layer of dry paint film thickness is -5mm. (10) The appearance of components should not be painted incorrectly or missed, and the coating should not peel or rust back. The coating should be uniform and free from obvious wrinkles, sags, pinholes, and bubbles. (11) According to the actual situation and structural form of the project, the division of inspection batches for each sub project is determined: 1) Steel structure welding sub project: for the project, each frame can be used as an inspection batch; Inspection batches can also be divided into several inspection batches based on different types of steel structure units or components combined with steel structure production and device sub items. 2) Fastener connection sub project: For the project, inspection batches can be divided based on different steel structure units and fasteners of different standards. 3) Steel parts and components processing: Steel parts and components can be divided into several inspection batches according to different types. 4) Steel component assembly: For large steel structures, the steel components produced by the factory need to be assembled into steel components as lifting units before lifting. Due to the high requirements for component assembly, several components can be used as one inspection batch based on the actual situation on site. 5) Steel structure pre assembly: For disorderly shaped steel structures, in order to ensure smooth assembly during high-altitude installation, pre assembly between relevant components needs to be carried out on the ground after production. Inspection batches can be divided according to the assembly between similar components as one inspection batch. 6) Steel structure installation: Steel structure installation can be divided into single-layer steel structure installation sub items or multi-layer and high-rise steel structure installation sub items. Single story steel structure installations can be divided into several inspection batches according to engineering zoning. Multi story and high-rise steel structure installation projects can be divided into one or several inspection batches according to the floor or construction section. 7) Molded metal plate engineering: Molded metal plate engineering includes molded metal plates used for roofs, wall panels, floor slabs, and other areas. From the material perspective, it can be divided into profiled steel plates with anti-corrosion coating on the surface, profiled aluminum plates, etc. It can be divided into one or several inspection batches based on deformation joints, floors, construction sections, or roofs, walls, floors, etc. 8) Steel structure coating engineering: The steel structure coating engineering includes anti-corrosion coating and fireproof coating. The division of inspection batches can be divided into one or several inspection batches according to the principles of steel structure production or steel structure installation engineering inspection batches. (12) The quality inspection content and corresponding qualification standards of sub projects should comply with the following provisions: 1) Steel structure welding, fastener connection, steel parts and components processing, steel component assembly, steel component pre assembly, steel structure device, profiled metal plate, steel structure coating and other sub projects should comply with the qualified quality standards; 2) Quality control materials and documents should be complete; 3) The inspection and witness testing results related to safety and function should meet the requirements of the corresponding qualified quality standards in GB50205-2020 standard;

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 智汇工业-智慧工业、智能制造及工业智能、工业互联门户网站,专业的工业“互联网+”传媒 | 消防车厂家_东风水罐泡沫消防车价格图片吨位-湖北新东日专用汽车有限公司 | 人民交通网-人民交通杂志官网 | 思行科技-珠海小程序开发-珠海网站建设-珠海APP开发-江门小程序开发-江门网站建设-江门APP开发 | 配重铁砂|合金钢丸|山东铁砂|济南嘉日金属制品有限公司 | 苏州注塑|无锡注塑|上海注塑|苏州汉科精密注塑有限公司 | 机械智能停车设备_智能机械式立体停车库_立体车库停车设备租赁_山东科博机械车库 | 专利申请|知识产权贯标|商标提异议|国外专利申请-润平知识产权 | 云南亿华工贸有限公司-云南护栏网-云南锌钢护栏-昆明市政护栏-工地护栏-昆明护栏网厂家 | 悬挂式小鼠笼架,植物标本采集箱,昆虫标本盒厂家-北京合力科创科技发展有限公司 | 意优教育|意大利留学中介_意大利留学费用_意大利申请条件_北京意大利语培训学校 | 深圳五洲中医院_深圳好的中医院_深圳市医保定点医院[官网] | 铝合金锻造|链轮曲柄-同力铝业股份有限公司 | 组合包装箱,折叠包装箱,烟台木箱,烟台包装箱-烟台顺达包装有限责任公司 | 捷胜通运|超大件双清专线|欧美专线|订舱|订柜|订船|双清包税|纯电池运输|液体粉末专线| | 四川迪瑞机电设备有限公司-容积式换热器|半容积式换热器|容积式换热机组|半容积式水加热器|换热器在线除垢防垢器|迪瑞机电 | 勺子互联-b2b电子商务平台,免费产品发布 | 五金冲压厂家_五金冲压件加工_微细孔加工-深圳市浩鑫精密五金制品有限公司 | 青岛抛丸机_抛丸清理机_树脂砂设备_除尘设备| 远红外桑拿房-江苏侨达健康科技有限公司 | 文君阁-提供生活百科,日常生活健康小常识,生活小窍门,百科知识大全 | 生物安全柜检测,GMP设备确认,仪器性能确认,洁净厂房检测,仓储温湿度检测-上海熙迈 | 监控工程,安防监控公司,北京监控安装,北京安装监控,安装摄像头,北京监控维保,监控施工,北京监控维修,监控弱电工程,监控器安装,监控维护保养,监控工程设计,北京监控设备维修,监控报警安装,北京北方合力科技有限公司 | 厦门空压机-厦门空压机出租-厦门钻机出租-厦门岩立盛机电设备有限公司 | 乌海市腐植酸盐加工,内蒙古腐植酸钠,内蒙古型煤粘合剂生产厂家|创联腐植酸盐加工有限公司 | 中空吹塑-PETG吹塑加工-吹塑玩具-东莞市鹏美塑胶五金有限公司 | 净水器厂家_杭州净水器厂家_杭州拥政科技有限公司 | 真空热处理-渗碳热处理-氮化热处理-[东莞德亿]专业热处理加工厂家 | 水阻柜-液阻柜-高压开关柜-高压固态软启动柜-磁控软启动柜-电解粉-无功补偿柜-配电柜-襄阳源创电气 | 天津市力豹润滑科技有限公司 | 新余市国信融资担保有限公司 | 江苏维赛科技生物发展有限公司 | 西安防静电地板_防静电地板厂家_防静电地板价格_OA网络地板_写字楼架空地板_机房墙板安装-红梅防静电地板厂家直销 | 陕西筱润智能科技有限公司 干部人事智能档案柜 智能密集架 智能档案柜 部队选层文件智能柜 智能枪弹柜 财务智能档案柜 边防武警智能密集架 医院智能档案柜 部队选层文件智能柜智能枪弹柜 学校医院文件柜 企事业单位公检法智能文件柜 生产厂家-筱润智能科技有限公司 RFID射频智能密集架 全自动智能选层档案柜 智能密保柜 枪柜部队营房营具床桌椅办公家具 办公用品档案盒设备货架 全自动智能选层柜生产厂家-筱润智能科技有限公司 | 专业液压对辊,双齿辊破碎机,沙子烘干机,制砂洗沙设备生产线厂家 - 巩义市吉宏机械 | 石墨热场|PECVD石墨舟|碳碳框|燃料电池双极板|半导体石墨|光纤用石墨模具|石墨电极加工|石墨制品|上海弘竣新能源材料有限公司 | 十堰急开锁0719-8888139|十堰开锁公司|十堰开锁电话|十堰换锁价格-同福锁城-十堰同福锁城 | 全网营销_网络推广外包_全网营销代运营公司-湖南微望互动 | 眉山净源居环保科技有限公司,眉山除甲醛公司,眉山甲醛治理,眉山保洁服务,眉山家政保洁,眉山家电维修 - 眉山净源居环保科技有限公司,眉山除甲醛公司,眉山甲醛治理,眉山保洁服务,眉山家政保洁,眉山家电维修 | 回收求购煤矿机械矿山设备,二手液压支架,刮板输送机-华建智能再生资源公司 | 引流砂_铁钩料_吹氧管_涂层吹氧管_耐火涂层吹氧管-山东恒诚 |