Design Plan for Steel Structure Construction Organization

Time:[2023-7-27]  Hits:2200

1、 Project Overview


Construction unit:


Project Name:


Construction unit:


Construction structure:


2、 Construction preparation


2.1 Skill Preparation

 


1. Before the official start of construction, on-site skill briefing work will be carried out in conjunction with the Planning Institute. After reviewing and positioning the guide points, a construction wire point measurement and control network will be established before the start of construction.


2. Conduct on-site verification of skill documents, familiarize yourself with the content of the documents, and based on construction investigations, promptly submit problems in the planning to the planning unit for resolution. Together, make supplementary construction drawings according to construction needs.


3. Based on the construction site investigation, planning documents, and the requirements of the owner, prepare an implementation construction organization plan, organize and guide the construction.


4. Prepare a special construction plan based on the planning documents.


5. Organize the debris, garbage, etc. within the construction site boundary.


6. Arrange a construction team to enter the site and prepare for construction.


7. Preparation of construction personnel, equipment, and materials, as well as skilled management personnel for this project, with equipment in place to meet construction requirements.


8. Do a good job of pre job training and safety education, communicate with all parties together, contact material sources, and acknowledge the transportation routes.


9. Select and implement construction teams with construction skills and experience that can ensure project quality to undertake various construction missions


2.2 Data preparation


Before leaving the factory, the steel components should be inspected by the manufacturer in accordance with the relevant specifications of the manufacturing specifications and the requirements of the planning diagram, and quality reports and actual error values should be filled out. After the steel components are delivered to the structural installation unit, the structural installation unit will conduct re inspection or spot check based on the quality report of the manufacturing plant and the classification of the components according to their properties


2. Based on the construction drawings, calculate the quantity of each main consumption data (such as welding rods, welding wires, etc.) and connecting parts (such as high-strength bolts, ordinary bolts), make order arrangements, and acknowledge the arrival time


3. After the quantity of temporary support, steel structure assembly platform, scaffolding support, safety protection, and environmental protection equipment required for each construction process is recognized, they will be arranged to enter the factory for manufacturing and installation.


2.3 Primary equipment


In steel structure construction, the main machines commonly used include: AC/DC welding machine, C02 gas shielded welding machine, Bench grinder, wire rope, rigging, Dumpy level, etc.


2.4 Operating conditions


1. The joint review of various planning plans has been completed.


Based on the structural deepening drawings, verify the stress conditions of the components during the steel structure installation, scientifically predict their possible deformation, and take corresponding reasonable technical measures to ensure the smooth operation of the steel structure installation


The review of construction plans for each special type of work has been completed.


The reinforced concrete foundation has been completed and passed the acceptance.


Temporary electricity and water supply for construction are laid in place.


6. Mobilization of labor force


7. The construction equipment and devices have passed the debugging and acceptance.


The incoming acceptance inspection of 8 components is qualified.


3、 Steel structure construction process


3.1 Process flow


Preparation of components, equipment, and personnel → Setting out and inspection of lines (axis and elevation) → Acceptance of embedded bolts and treatment of foundation surface → Component centerline and elevation line → Installation of column and beam center structure → Initial and final tightening of high-strength bolts → Welding of column to column nodes → Spot welding of beams and columns and beam joints → Scattered component (corner support) devices → Device pressed square steel → Welding and bolt connection


3.2 Operation process


1. Steel structure lifting sequence


Steel structure lifting generally requires distinguishing the lifting operation area, and steel structure lifting is carried out together in parallel order according to the distinguished area. After the lifting of a certain area is completed, measurement, calibration, and initial tightening of high-strength bolts are carried out. After several areas are installed, the overall measurement, calibration, final tightening of high-strength bolts, and welding are carried out. After welding and retesting, proceed to the lifting of the next section of the steel column. And according to the actual situation on site, carry out the lifting and partial laying operations of this laminated steel plate.


2 bolt embedment


The accuracy of the column orientation depends on the accuracy of the embedded bolt orientation. Control the elevation error of embedded bolts within+ Within 5mm, the error in positioning the axis should be controlled within ± 2mm.


3 Steel column installation process


Section 1 Steel Column Hoisting


(1) Setting of lifting points


The orientation and number of lifting points are recognized based on the specific conditions of the steel column shape, section, length, and crane function. Generally, steel columns have good elasticity and rigidity, and the lifting point adopts a single point positive lifting. The lifting point is set at the top of the column, with the column body vertical and passing through the center of gravity of the column, making it easy to lift, align, and calibrate. When multiple components are assembled into expanded units on the ground for installation, the lifting point should be accounted for and recognized.


(2) Lifting method


1. In multi-storey and high-rise steel Structural engineering, steel columns are generally lifted by a single machine, and for special or overweight components, double machines can also be used.


2. When lifting, it is necessary to keep the steel column straight and try to reverse and straighten it without dragging the root. During the lifting reversal process, attention should be paid to preventing collisions with other components that have already been lifted, and the sling should have a certain effective height. When lifting the first section of the steel column, a protective sleeve should be added to the embedded anchor bolt to avoid damaging the thread of the anchor bolt when the steel column is in place


3. The first section of the steel column is installed on the column base. Before installing the steel column, the climbing ladder and hanging basket should be hung in the predetermined position of the steel column and firmly bound. After lifting in place, the foundation bolts should be temporarily fixed and the straightness should be checked. The two sides of the steel column are equipped with temporary fixing connecting plates. After the upper section of the steel column is aligned with the center line of the lower section of the steel column top, the connecting plates are temporarily fixed with bolts.


It is necessary to wait for the anchor bolts to be fixed before loosening the sling.


(3) Steel column proofreading


Steel column proofreading requires three tasks: adjusting the elevation of the column base, adjusting the axis of the column base, and proofreading the straightness of the column body. Throughout the entire process, measurement is the primary focus.


1. Column base elevation adjustment


After placing the steel column, use the nuts or elevation adjustment blocks under the column bottom plate to control the elevation of the steel column (because some steel columns are too heavy, bolts and nuts cannot bear their weight, so a height adjustment block - steel plate adjustment elevation - needs to be added under the column bottom plate). The accuracy can be controlled within ± 1mm. The gaps reserved under the column bottom plate can be filled with high-strength, slightly expanded, and non-shortened mortar using the grouting method. When adjusting the elevation of the column base plate using nuts, the strength and stiffness of the anchor bolts should be calculated.


2. Adjustment of column bottom axis in the first section


Alignment method: Without loosening the hook of the crane, align the four points on the column base plate with the control axis of the steel column and slowly lower to the planned elevation direction.


3. Correction of Column Body Straightness in the First Section


Use cable wind rope calibration method. Use two 90 ° Theodolite to straighten. During the calibration process, continuously fine tune the nuts under the column base plate until the calibration is completed. Screw on the two nuts above the column base plate. The cable wind rope is loosened without force, and the column body is in a free state. Then recheck it with a Theodolite. If there is a slight error, repeat the above process until there is no error, and tighten the upper nuts. The nut on the anchor bolt is usually a double nut, which can be welded firmly with the screw after the nut is tightened.


Weld the nut and screw firmly.


4. Adjustment of column top elevation and control of other structural steel column elevations


There are two methods for adjusting the top elevation of columns and controlling the elevation of other structural steel columns: one is to install according to the relative elevation, and the other is to install according to the planned elevation. Generally, relative elevation devices are used. After the steel column is lifted in place, the connecting ear plates connecting the upper and lower steel columns should be fixed with large hexagonal high-strength bolts, but they should not be tightened too tightly. After being lifted by a crane, the crowbar can adjust the gap between the columns. Measure the pre calibrated elevation values of the upper and lower column tops, and after meeting the requirements, use steel wedges and spot welding to limit the drop of the steel column. Considering the welding seam and compression deformation, adjust and control the elevation error within 4mm.


5. Section 2 Steel Column Axis Adjustment


To ensure that the upper and lower columns do not show staggered joints, try to ensure that the centerline of the upper and lower columns overlaps as much as possible. The center line error of the steel column should be adjusted within a range of 3mm each time. If the error is significant, it should be adjusted 2-3 times. The positioning axis of each steel column is absolutely not allowed to use the positioning axis of the next steel column. It should be led from the ground control line to high altitude to ensure that each steel column device is correct and prevent excessive accumulation of errors.


6. Section 2 Steel Column Straightness Calibration


The key to proofreading the straightness of steel columns is to pre check the relevant dimensions of the steel columns. The straightness error at the top of the lower steel column is a comprehensive result of the bottom axis, displacement, welding deformation, sunlight effect, straightness correction, and elastic deformation of the upper steel column. Partial errors can be eliminated by reserving straightness error values. When the reserved value is greater than the accumulated error value of the next column, only the accumulated error value is reserved. Otherwise, the reserved value is reserved, and its direction is opposite to the error direction. Empirical value measurement: The general weld seam shortening value between beams and columns is less than 2mm; The shortening value of the column to column weld seam is generally 3.5mm


4. Steel beam installation process


1. Steel beam device


Steel beam devices are generally lifted using tool type lifting lugs or binding methods. Before installation, the center symbol of the steel beam should be introduced to the end of the steel beam to facilitate temporary positioning according to the positioning axis of the column bracket during lifting.


2. Calibration of steel beams


Proofreading includes elevation adjustment, vertical and horizontal axis adjustment, and straightness adjustment. It is necessary to proofread the steel structure beam after the structure forms a stiffness unit.


3. Elevation adjustment


Use a Dumpy level to stand on the beam or a specially erected platform to measure the elevation of both ends of each beam, weighted average all the data, and calculate a standard value. Calculate the elevation adjustment values of each point based on the standard values.


4. Vertical and horizontal axis calibration


Use a Theodolite to lead the axis to the column, determine the distance between the center line of each beam and the axis, pull a long rope (or use a Theodolite) on the center line of the beam top, and use a chain block to adjust the beam ends one by one. After the longitudinal and transverse axes of the steel beam meet the requirements, recheck the span of the structural beam.


5. Straightness proofreading


Straightness correction: Hang a hammer ball from the upper flange of the beam and measure the horizontal spacing between the wire rope and the upper and lower parts of the beam web. Adjust again based on the inclination of the beam (a ≠ a ') to make a=a.


6. Special rust removal equipment is used for rust removal, and shot rust removal can improve the fatigue strength and corrosion resistance of steel. The hardness of the steel surface is also improved to varying degrees, which is conducive to the adhesion of the paint film without the need for additional coating thickness. The abrasive used for rust removal must comply with quality standards and process requirements, and the relative humidity of the construction environment should not exceed 85%.


The surface of the steel after rust removal must be cleaned with tools such as a brush before proceeding to the next process. If the surface of the steel after rust removal is qualified and has returned to rust before applying primer, it needs to be re rust removed.


7. Paint


After passing the inspection of rust removal on the steel, the first layer of primer is applied on the surface. Generally, after the rust removal is completed, it is stored in the factory and can be coated within 24 hours. If stored outside the factory, the primer should be painted on duty. The paint should be applied in accordance with the planning requirements. After the first coat of primer is dry, the intermediate and top coats should be applied to ensure that the thickness of the coating meets the planning requirements. The paint should be evenly applied without sagging during the brushing process.


4、 Key points of quality acceptance


1 base and support surface


The positioning axis of the building, the positioning axis and elevation of the columns on the foundation, the specifications and orientation of the anchor bolts (anchor bolts), and the fastening of the anchor bolts (anchor bolts) should meet the planning requirements.


The fastening should meet the planning requirements.


2 Devices and proofreading


1. Steel components should comply with planning requirements and regulations. The deformation and coating detachment of steel components caused by transportation, stacking, and lifting should be corrected and repaired.


2. For nodes that require top tightening, the touch surface should not be less than 70% tight, and the maximum edge gap should not be greater than 0.8mm.


3. The surface of the steel structure should be clean, and the primary surface of the structure should be free of scars, mud, and other dirt.


When the steel component is installed on a concrete column, the error between its support center and the positioning axis should not exceed 10mm


5. Steel platforms, ladders, and railing devices in multi-layer and high-rise steel structures should comply with the current national standards of "Fixed Steel Vertical Ladders" (GB4053.1), "Fixed Steel Inclined Ladders" (GB4053.2), "Fixed Protective Rails" (GB4053.3), and "Fixed Steel Platforms" (GB4053.4).


5、 Product protection


1. High strength bolts, studs, welding rods, welding wires, etc. are stacked on shelves in the warehouse, with a maximum of four layers of stacking.


2. The stacking of steel components requires the site to be flat, sturdy, clean, dry, neatly stacked, with sleepers underneath, and to be resistant to deformation and rust.


3. It is not allowed to weld or cut completed components arbitrarily, or stack objects in the air. Welds and node plates that have been completed and inspected as qualified should be immediately sorted out and sealed as required.


When lifting the steel structure into position, it should be slowly lowered and should not collide with the already installed steel structure.


5. Carefully manage the manufactured steel columns, etc., to prevent the unreasonable placement of cushion base points from bending and deformation.


6、 Environmental and occupational health and safety control measures


1 Environmental control measures


1. When welding, steel pipes are used to set up protective railings, and colored cloth is used to surround the railings to prevent the exposure of arc light and welding smoke and dust.


2. Waste generated during and after construction should be recycled and treated.


2 Occupational Health and Safety Measures


1. It is necessary to include the safety skills and measures for operations, as well as the required equipment, in the construction organization plan of the project.


2. Corresponding responsibility systems should be established for unit project construction. Before construction, safety skill education and disclosure should be carried out step by step, and all safety skill measures should be implemented. Construction should not be carried out without implementation.


3. It is necessary to inspect the facilities and equipment used in high-altitude operations before construction, and only after acknowledging their integrity can they be put into use.


4. It is necessary for climbing and suspended operators to hold a certificate and undergo regular professional knowledge assessment and physical examination. It is necessary to wear a safety helmet, fasten a seat belt, wear anti slip shoes, and carry a tool bag when on duty.


5. The high-altitude operation area should have clear signs and be guarded by dedicated personnel. Personnel unrelated to lifting are prohibited from entering. During crane operation, no one is allowed to stand within the rotating radius of the boom.


6. When transporting lifting components, it is prohibited to stand on the components to command and place materials and tools.


7. It is necessary to bind the components firmly, and the lifting point should pass through the center of gravity of the components. When lifting, it should be stable to prevent vibration or oscillation.


8. When working at heights, safety nets need to be installed to prevent accidents caused by personnel, materials, and tools falling or flying out.


9. All objects that may fall from the construction site should be removed or fixed first. The materials used in high-altitude operations should be stacked steadily and not obstruct passage and loading and unloading.


10. When conducting high-altitude operations on rainy and snowy days, it is necessary to take reliable anti slip, cold and freezing measures. Water, ice, frost, and snow should be promptly removed. Before construction, go to the local meteorological department to understand the situation and take measures to prevent typhoons, rain, freezing, cold, and high temperatures. Before and after the snowstorm and typhoon rainstorm, the safety facilities for high-altitude operation shall be checked one by one, and the problems found shall be improved immediately.


11. During the process of structural installation, it is not allowed to operate in the same straight direction when each type of work is engaged in vertical crossing operations. The orientation of the lower level operation needs to be outside the radius of the possible falling range recognized according to the height of the upper level; When the above conditions are not met, a safety protection layer should be set up.


7、 Issues to pay attention to


The quality of pre assembled steel components should meet the planning requirements and quality specifications. The length dimensions of components such as columns, beams, and supports should include deformation values such as welding shortening allowance.


The detection of device errors should be carried out after the structure forms a spatial stiffness unit and is connected and fixed.


When installing 3 devices, it is necessary to control the construction load of the platform flooring, and the construction load must not exceed the bearing capacity of beams, deck slabs, platform flooring, etc.


Only after the installation, welding, and bolting of all components of each column are completed and accepted can the positioning axis of the previous column be measured from the ground.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美一级性 | 欧美福利视频在线观看 | 国产丝袜一区视频在线观看 | 白嫩情侣偷拍呻吟刺激 | www天天色 | 丰满孕妇性春猛交xx大陆 | 91丝袜一区在线观看 | 免费无遮挡无码视频在线观看 | 成人做受视频试看60秒 | 超碰人人插 | 91精品一久久香蕉国产线看观看新通道出现 | 色婷婷97 | 91成人精品视频 | 九九热视频在线免费观看 | 国产猛男猛女无套av | 无码av岛国片在线播放 | 国产一区日韩 | 国产精品久久久久久久久久久久久久久久久久 | 秋霞影院午夜伦a片欧美 | 亚洲资源在线观看 | 中文无码精品a∨在线观看不卡 | 国产免费黄色录像 | 国产成人精品久久综合 | 男生美女隐私黄www 男生女生羞羞网站 | 亚洲小视频在线播放 | 内射老阿姨1区2区3区4区 | 亚洲在线看| 五月婷婷开心中文字幕 | 偷看少妇做爰过程裸体 | 国产又粗又猛又爽又黄的 | 国产艳情片 | 品久久久久久久久久96高清 | 国产精品久久久久久久一区探花 | 69精品欧美一区二区三区 | 美日韩一区二区三区 | 人体写真 福利视频 | 国产一区二区免费看 | 亚洲一区二区av | 亚洲天堂精品视频 | 天堂综合网 | 色爱av | 国产亚洲无| 亚洲视频导航 | 国产露双乳喂奶在线观看 | 国产l精品国产亚洲区在线观看 | 国产农村老头老太视频 | 欧美日韩在线播放三区四区 | 男人的天堂欧美 | 10000部拍拍拍免费视频 | 欧美xxxx做受欧美1314 | 男人扒开女人腿桶到爽免费 | 亚洲国产一二三精品无码 | 国产免费网址 | 国产精品入口日韩视频大尺度 | 免费欧美日韩 | 中文字幕免费一区二区 | 久久疯狂做爰流白浆xxxⅹ | 91网址在线播放 | 成人网在线播放 | 欧美s码亚洲码精品m码 | 免费看成人啪啪 | 91九色精品 | 亚洲男人第一av网站 | 污污污www精品国产网站 | 日本最新免费二区三区 | 亚洲一二三区不卡 | 免费视频精品 | 亚洲1区 | 四虎av在线播放 | 五月婷婷综合色 | 波多野结衣av高清一区二区三区 | 国产精品久久毛片 | 成人免费直播 | 日韩中文字幕二区 | 6080影视最新97理伦片 | 欧美日韩一卡二卡三卡 | 男女啪啪猛烈无遮挡猛进猛出 | 精品国产一区二区三区香蕉 | 999国产精品视频免费 | 91禁在线观看| 欧美第一页浮力影院 | 天堂网一区 | 亚洲夜色噜噜av在线观看 | 亚洲色成人www永久网站 | 久久激情影院 | 亚洲精品国偷自产在线99人热 | 成年女人午夜毛片免费视频 | 天堂成人网 | 操女网站 | 日本欧美韩国国产精品 | 日本大尺度床戏揉捏胸 | 欧美大片在线看免费观看 | 亚洲一区二区三区不卡视频 | 午夜精品一区二区三区免费 | 成人羞羞国产免费游戏 | 俺去射| 粗壮挺进人妻水蜜桃成熟 | 长春chinese少妇 | 亚洲v无码一区二区三区四区观看 | 日韩av一区在线 | 日本黄网站色大片免费观看 | 欧美一区二区国产 | 免费在线激情视频 | 又爽又大又黄a级毛片在线视频 | 久草新| 精精国产xxxx视频在线 | 88国产精品视频一区二区三区 | 欧美成人午夜精品 | 欧美日韩在线国产 | 久操香蕉 | 三级毛片网 | 寂寞的日本美妇 | 免费三片在线观看网站v888 | 国产电影无码午夜在线播放 | 蒂法3d一区二区三区 | 亚洲精品成人网站在线观看 | 中国一级黄色大片 | 999在线视频 | 9999国产精品欧美久久久久久 | 久久99国产精一区二区三区 | 调教一区二区 | 51久久国产露脸精品国产 | 国产91 精品高潮白浆喷水 | 脱了美女内裤猛烈进入gif | 日本少妇翘臀啪啪无遮挡 | 久久频这里精品99香蕉 | 天天草天天爱 | 久久九九热re6这里有精品 | a∨色狠狠一区二区三区 | 丰满岳妇乱一区二区三区 | 日产特黄极日产 | 国产精品人人爱一区二区白浆 | 欧美成人免费在线视频 | 欧美大片xxxx| 国产五区 | 新久草在线视频 | 国产免费黄视频 | 一 级做人爱全视频在线看 亚洲成a∨人片在线观看不卡 | 天天干天天射天天爽 | 欧美一区亚洲 | 国产热99| 亚洲精品久久久久久久久久 | 妺妺窝人体色www聚色窝 | 色婷婷夜夜躁狠狠躁麻豆免费 | 亚洲v国产v欧美v久久久久久 | 欧美69囗交视频 | 国产老女人91精品一区 | 中文字幕人妻熟在线影院 | 国产精品午夜在线 | 国产在线无码精品电影网 | 日韩一级片免费观看 | 久久亚洲国产精品日日av夜夜 | 国产精品短视频 | 亚洲jizzjizz日本少妇软件 | 国产精品亚洲一区二区在线观看 | 亚洲不卡中文字幕 | 久章草在线观看 | 国产精品爱久久久久久久 | 国产精品亚洲一区二区三区喷水 | 91久久综合亚洲鲁鲁五月天 | 日本www黄 | 91精品久久久久久久久久入口 | 少妇人妻无码专区在线视频 | 久久精品无码免费不卡 | 亚洲人成伊人成综合网小说 | 国产精品裸体一区二区三区 | 亚洲国产精品无码久久电影 | 麻豆精品一区综合av在线 | 香蕉国产在线视频 | 亚洲综合无码一区二区 | 国产亚洲精品久久久久蜜臀 | 亚洲女同恋hd | 国产精品9999 | 一区二区三区精品国产 | asiass极品裸体女pics | 哺乳援交吃奶在线播放 | 国产又粗又黄又猛 | 性一交一乱一区二区洋洋av | 中文字幕av亚洲精品一部二部 | 99精品国产免费久久 | jazzjazz国产精品麻豆 | 日韩免费三级 | 亚洲欧洲在线播放 | 一区二区三区高清 | 99视频网站 | 国产精品无码久久久久成人影院 | 国产精品久久久久9999小说 | 欧美两根一起进3p做受视频 | 国产视频xxx | 欧美一级片在线 | 一级肉体全黄裸片 | 日日夜夜综合 | 少妇激情一区二区三区 | 毛片入口 | 两个奶头被吃高潮视频 | 黄色毛片视频 | 爱情岛论坛国产首页 | 国产女爽123视频.cno | 91精品国产成人观看 | 国产美女视频国产视视频 | 午夜福利国产精品久久 | aⅴ亚洲 日韩 色 图网站 播放 | 国产激情无套内精对白视频 | 久久精彩| 九色综合狠狠综合久久 | 精品久久久久久无码国产 | 91香蕉视频在线看 | 国产欧美日韩在线观看 | 四虎在线免费播放 | 精品国产污污免费网站入口爱酱 | 国产麻花豆剧传媒精品mv在线 | 亚洲 日本 欧美 中文幕 | 午夜性色福利在线视频福利 | 大伊人网 | 国产97人人超碰caoprom | 欧美亚洲激情 | 黑人ⅴvideo粗暴亚洲娇小 | 国产av熟女一区二区三区 | 好吊妞视频788gao在线观看 | 黄色小视频免费 | 国产精品一品二区三区的使用体验 | 日本熟妇大乳 | 日本中文字幕在线视频 | 日韩在线精品强乱中文字幕 | 国产你懂 | 青青久草在线视频 | 中文字幕一区二区三三 | 色av免费| 99久久精品国产免费看 | 中文人妻av久久人妻18 | 亚洲第8页 | 国产网红主播三级精品视频 | av片免费播放 | 成人免费性视频 | 久久综合亚洲色一区二区三区 | 欧洲精品一区二区三区 | 亚洲免费黄色网址 | 精品久久免费观看 | 男人的天堂av高清在线 | 制服 丝袜 综合 日韩 欧美 | 欧洲国产伦久久久久久久 | www成人| 亚洲在线免费 | 国产做无码视频在线观看浪潮 | 99热热 | 亚洲第一aaaaa片 | 日本丰满熟妇hd | 成人在线欧美 | 欧美视频在线观看一区二区三区 | 无码专区aaaaaa免费视频 | 91区人人爽人人都喜欢人人都有 | 精品伦精品一区二区三区视频 | 欧美成人三级精品 | 欧美特级黄色录像 | 天天干视频在线 | 国产乱淫av片杨贵妃 | 欧美日韩午夜群交多人轮换 | 免费看特级毛片 | 亚洲成av人影院在线观看 | 青青欧美 | 国产精品无码久久久久 | 夜夜av| 亚洲精品成人片在线观看 | 26uuu精品一区二区在线观看 | 男女视频一区二区三区 | av网站导航 | 国产超碰人人爽人人做人人爱 | 国产精品jizz在线观看美国 | 精品国产av一区二区三区 | 精品一区二区三区在线视频 | 国产精品美女久久久免费 | 亚洲v在线观看 | 免费大片av | 国产看黄网站又黄又爽又色 | 亚洲九九 | 久久久久久久国产免费看 | 国产理论精品 | 99精品欧美一区二区三区小说 | 老汉av | 农民人伦一区二区三区剧情简介 | 真实的国产乱ⅹxxx66小说 | 116少妇做爰毛片 | 亚洲成av人在线视 | 少妇xxx| 精品夜夜澡人妻无码av蜜桃 | www成人免费视频 | 国内精品久久久久久久影视麻豆 | 国模一二区| 亚洲欧美乱日韩乱国产 | 女人精69xxxⅹxx猛交 | 女人与拘做受全过程免费视频 | 午夜激情啪啪 | 国产精品久久久久白丝呻吟 | 日本午夜免费福利视频 | 免费黄色三级网站 | 99国内精品久久久久久久软件 | 成人日韩在线观看 | 免费av观看网址 | 免费无码av一区二区 | 在线 丝袜 欧美 日韩 制服 | 视频一区二区三区在线 | 国产精品ⅴ无码大片在线看 | 国产91精品看黄网站在线观看 | 高清视频一区二区三区 | frxxee中国xxee麻豆片 | a级a做爰片成人毛片入口 | 国产精品 视频一区 二区三区 | 老司机伊人| 日本乱偷互换人妻中文字幕 | 亚洲国产精品无码久久久久高潮 | 亚洲 欧美 日韩 在线 | 国产一级精品视频 | 久久久国产精华特点 | 亚洲国产一区二区a毛片 | 爱爱视频网站免费 | 亚洲国产日韩精品二三四区竹菊 | 亚洲h在线播放在线观看h | 久久视频在线观看 | 亚洲 制服 丝袜 无码 | 乱中年女人伦av三区 | 天堂成人av | 日本黄色www | 午夜免费网址 | 国产又黄又猛又粗又爽 | 久久久妇女国产精品影视 | 密桃av在线| 又爽又大又黄a级毛片在线视频 | 中文在线中文资源不卡无 | 日日夜夜一区二区 | 福利av在线 | 天天艹逼| 国产综合久久久久鬼色 | 日本精品一区二区三区四区 | 国产精品99久久久久久久vr | 瑟瑟在线视频 | 成人无码精品1区2区3区免费看 | 狠狠搞视频 | 欧美一区二区人人喊爽 | a毛片在线 | 久久久久久a亚洲欧洲av冫 | 国产一区二区三区中文字幕 | 日本精品高清一区二区 | 亚洲欧美激情国产综合久久久 | 国色天香网www在线观看 | 激情六月丁香 | 精品国精品国产自在久不卡 | 亚洲国产精品999久久久婷婷 | 黄色特级视频 | 不卡国产视频 | 肉嫁高柳在线 | 一本色综合亚洲精品 | 欧美草b| 丰满熟妇人妻中文字幕 | 国产69精品久久久久99 | 狠狠色噜噜狠狠狠狠 | 久久精品中文无码资源站 | 国产亚洲真人做受在线观看 | 91精品福利 | 亚洲国产精品久久久久久久 | 私色综合网| 你懂的视频在线播放 | 亚洲日本乱码在线观看 | 奇米av在线 | 国产精品一区二区久久乐夜夜嗨 | 国产高清精品在线 | 欧美v国产v亚洲v日韩九九 | 在线看不卡av | 99国产精品永久免费视频 | 午夜天堂精品久久久久 | bbbbbxxxxx性欧美 | 欧美3p在线观看 | 国产欧美日韩综合精品二区 | 亚洲经典一区二区三区 | 一区二区在线视频 | 日本无遮挡吸乳呻吟视频 | 欧美成人精品欧美一级 | 在线中文字幕视频 | 亚洲顶级毛片 | 国产91传媒| 老司机午夜精品视频资源 | 999久久久精品 | 午夜国产一区二区 | 亚洲最大国产成人综合网站 | 超碰区 | 色一情一伦一子一伦一区 | 91在线亚洲 | bnb99八度免费影院 | 一区二区三区人妻无码 | 麻豆一区二区在线观看 | 国产网站免费在线观看 | av大片网站 | 亚洲狠狠色丁香婷婷综合 | 日韩 欧美 亚洲 国产 | 亚洲无线码在线一区观看 | 美女视频久久 | 亚洲国产精品成人无久久精品 | 中文字幕日韩一区二区三区不卡 | 红桃17c视频永久免费入口 | 国产一线二线三线女 | 窝窝午夜看片 | 中文字幕91视频 | 久久爱涩涩www | 亚洲处破女av一区二区中文 | 亚洲精品码 | www久久久天天com| 日韩成人免费观看视频 | 99国产欧美精品久久久蜜芽 | 手机在线观看毛片 | 国产精品久久久久久久久久软件 | 6080yy午夜一二三区久久 | 少妇高潮惨叫喷水在线观看 | 一天天影影综合网 | 日韩欧美成人免费观看 | 欧美日韩成人一区二区三区 | 91精品国产综合久久久久久软件 | 精品国产区一区二 | 天天综合网天天综合色 | 日日躁狠狠躁aaaaxxxx | 久久黄色免费网站 | 成人免费在线小视频 | 激情国产 | 又粗又爽又猛高潮的在线视频 | 操碰视频 | 妇女性内射冈站hdwwwooo | 在线黄色网页 | 午夜啪视频 | 春色激情 | 俺来也俺也啪www色 俺啪也 | 亚洲精品乱码久久久久久按摩观 | 久久精品国产欧美日韩 | 欧美日韩99| 中文在线a在线 | 日韩性av| 国产亚洲成av人片在线观黄桃 | 人人草人人看 | 91在线观看免费视频 | 瑜伽裤国产一区二区三区 | 日韩精品中文字幕一区二区 | 久久狠狠高潮亚洲精品 | 夜夜夜操 | 石原莉奈在线播放 | 欧美毛茸茸 | 国产精品毛片久久 | 中文字幕精品亚洲无线码二区 | 黄色免费网站在线 | 摸丰满大乳奶水www免费 | 亚洲图色视频 | 一区二区亚洲精品国产精华液 | 色吧av| 国产精自产拍久久久久久蜜 | 免费成年人高清视频 | 日韩国产精品一区二区三区 | 久热这里只有精品6 | 精品入口麻豆88视频 | 成人综合婷婷国产精品久久蜜臀 | 黑白配在线观看免费观看 | 深夜福利一区二区 | 欧美黑人xxxx高潮猛交 | 久久成人免费视频 | 国产综合视频在线 | 中文字幕第49页 | 久久精品亚洲日本波多野结衣 | 九色pony麻豆 | 国色天香网www在线观看 | 美女网站污 | 一本一道久久综合狠狠老精东影业 | 国产伦精品一区二区三区免费观看 | 香蕉99久久国产综合精品宅男自 | www深夜福利 | 欧美白嫩少妇xxxxx性 | 国产精品久久久久久久久免小说 | 日韩福利视频导航 | 久一区二区三区 | 亚洲一区二区精品在线 | 公妇乱淫免费观看 | 国产一区二区精品在线观看 | 免费观看一区二区三区视频 | 国产无毛片 | 国产91天堂素人搭讪系列 | 色成人免费网站 | 免费观看全黄做爰大片国产 | 精品国产一区二区三区四区在线 | 欧美变态另类刺激 | 日本边添边摸边做边爱的网站 | 国产午夜大地久久 | 99久久99久久精品免费看蜜桃 | 欧美性猛交一区二区三区精品 | 日本做爰全过程免费的叫床 | 三级黄色毛片 | 国产精品伦一区二区三级视频 | wwwxxxcom国产| 少妇出轨精品中出一区二区 | 国内精品999 | 中国精学生妹品射精久久 | 日本久久高清 | 亚洲精品综合五月久久小说 | 亚日韩av| 另类捆绑调教少妇 | 国产欧美日韩专区 | 香港澳门三级做爰 | 国产一区二区三区不卡在线观看 | 蜜臀av夜夜澡人人爽人人 | 亚洲日本黄色片 | 日批网址 | 三叶草欧洲码在线 | 日本又色又爽又黄的a片18禁 | 中文字幕第十一页 | 成年无码av片在线狼人 | 国产欧美一区二区精品久久 | 亚洲色偷精品一区二区三区 | 久久人人爽人人爽人人片 | 国产亚洲xxxx在线播放 | av一区二区在线观看 | 三级免费黄| 国内自拍农村少妇在线观看 | 97人人超碰国产精品最新 | 中文字幕一区二区在线播放 | 在线区 | aⅴ色国产 欧美 | 精品国产欧美一区二区 | 亚洲日韩欧美一区二区三区 | 亚洲无圣光 | 国产a免费| 人妻色综合网站 | 精品厕所偷拍各类美女tp嘘嘘 | 狠狠色噜噜狠狠狠狠色综合久 | 成人免费观看49www在线观看 | 国产一区二区三区四区五区入口 | 色综合久久综合网 | 中文字幕在线看 | 4455四色成人网 | 日本aaa视频 | 亚洲精品国偷拍自产在线观看 | 欧美精品一区二 | 日韩国产欧美一区二区三区 | 国产成人一区二区三区影院动漫 | jizz欧美性10| 久久精品人人爽 | 婷婷色在线视频 | 久久精品国产欧美亚洲人人爽 | 亚洲精品国产拍在线 | 中文字幕在线观看线人 | 国产无区一区二区三麻豆 | 国产美女亚洲精品久久久毛片小说 | 乳女教师の诱惑julia | 亚洲女优视频 | 姑娘第5集在线观看免费 | 亚洲欧美乱日韩乱国产 | 国产乱人内谢69xxxx亚洲 | 国产精品一二三区视频 | 中文字幕有码在线观看 | 欧美人与野鲁交xxx视频 | 亚洲女欲精品久久久久久久18 | 国产91清纯白嫩初高中在线观看 | 精品无码专区毛片 | 91无人区乱码卡一卡二卡 | 国产在线观看免费视频今夜 | 99精品欧美一区二区蜜桃美图 | 五月激情六月丁香 | 九九精品成人免费国产片 | 中文韩国午夜理伦三级好看 | 999精品视频在线 | 国产麻豆精品传媒 | 性欧美xxx内谢 | 在线免费观看视频黄 | 777米奇影院狠狠色 一日本道a高清免费播放 | 色999av| 国模和精品嫩模私拍视频 | 欧美一区视频在线 | 欧美巨大另类极品videosbest | 天堂网手机版 | caoporn国产精品免费公开 | 99re国产精品视频 | www.天天综合 | 四虎一区二区 | 又色又爽又激情的59视频 | 精品丝袜人妻久久久久久 | 日本白嫩少妇hdtube | 国产精品日本一区二区不卡视频 | 老司机精品视频一区二区三区 | 免费污视频在线观看 | 中文字幕第10页码 | 久久久久久久999 | 国产专区在线播放 | 蜜桃无码一区二区三区 | 69久久久成人看片免费一区二 | 粗大猛烈进出高潮视频 | 国产精品嫩草影院av | 国产精品不卡一区 | jizz中国女人高潮 | 国产精品久久999 | 久久久精品网站 | 精品人体无码一区二区三区 | 日韩国产传媒 | av在线资源| 国语对白新婚少妇在线观看 | 天天草天天爽 | 免费专区丝袜调教视频 | 免费三片在线视频 | 成人激情免费视频 | 91免费视频 | 亚洲午夜国产一区99re久久 | 日本中文字幕网 | 国产91黄色 | 美腿丝袜高跟三级视频 | 亚洲视频在线免费播放 | 两人做人爱费视频午夜 | 国产www色| 久久精品国产一区二区 | 亚洲色婷婷六月亚洲婷婷6月 | 白天躁晚上躁麻豆视频 | 5678少妇影院| 国产精品成av人在线视午夜片 | 久热精品视频 | 五月激情四射网 |