What are the methods for strengthening the components of steel structure factory buildings?

Time:[2022-12-7]  Hits:1999

In steel structure plants, the most common components are steel columns and steel beams, which are a large part of the support and bearing, and the composition of the structure is an important component. The first component of steel structure plant is to be able to select different data to establish and form different data. The natural functions and quality of different data also have certain differences. It can also create different types of plants, such as multi-storey steel structure plant, light steel structure plant, brick concrete structure plant, etc. Only by controlling the quality of related components can the installation quality of all structures be improved.

 


1. Unloading method of steel structure column


When it is necessary to reinforce or replace new columns under unloading, the method of "joist and column replacement" shall be adopted. When only the upper column needs to be reinforced, the roof truss can be supported by crane beam bridge to unload the column. When the lower column needs to be reinforced or the process needs to cut off the lower column, a permanent joist can be set under the crane beam to share the load of the upper column (including the load of the crane beam) on the adjacent column (it is necessary to check the adjacent column and reinforce it, but also check the foundation). When selecting this method, it should be considered that after the joist is used to replace the lower column, the joist will have a certain deflection, forcing the original roof truss to sink, which may damage the connection nodes of the components connected to the roof truss. For this purpose, temporary load can be added on the joist in advance to make the joist have a pre deflection. The order of choosing this method is to strengthen adjacent columns, weld joists and adjacent columns, and add temporary loads Weld joists and center columns, remove temporary loads, and reinforce or cut off lower columns.


2. Reinforcement method of steel structure and steel column


The section of reinforced column in the reinforcement of steel structure workshop. Generally, steel plate or section steel is used to strengthen the section of reinforced column, welding bolts or high-strength bolts are used to connect the column as a whole, and additional supports are added. Add braces to reduce column length and improve positive bearing capacity. The stability of the column is proposed under the condition that the section standard is unchanged; Change the calculation chart to reduce the external force or internal force of the column; The reinforced concrete wrapped around the steel column can obviously improve the bearing capacity of the column.


3. Reinforcement of steel structure column base


There is no reinforcement method for the thickness of the column floor in the reinforcement of the steel structure workshop: add the stiffening rib of the column base to reduce the bending moment of the bottom plate, and pour concrete between the column base steel to make the column base plate become a rigid block, so as to improve the adhesion of the column base surface and eliminate the corrosion of the paint and the column base surface.


There is no reinforcement method for column foot anchor in steel structure workshop reinforcement: add additional anchor. Select when the concrete foundation is wide.


Drill holes on the concrete foundation, insert additional anchor rods, pour epoxy mortar or sulfur mortar (the hole diameter is 20 mm for the anchor rod, and the depth is more than 30 d), and wrap the entire column base with reinforced concrete. The new reinforcement shall extend into the foundation and be welded with the original reinforcement in the foundation.


4. Checking calculation of bearing capacity of steel structure column reinforcement


The important problem of reinforcement accounting under load is whether the stress after reinforcement can be redistributed, that is, whether the original section after reinforcement can distribute the original stress to the newly reinforced member section. If it can be redistributed, the sum of new and old loads can be evenly distributed to the new and old sections, otherwise the original load will still be borne by the original section, and the new and old loads will be evenly shared by the new and old sections (i.e. the total section after reinforcement).


So far, the redistribution of stress after reinforcement has not been fully proved by experiments (at least in the elastic stage), but for static loaded structures, when a part of the section enters the plastic situation, the stress will eventually be redistributed, so the static loaded structures can be accounted for by working together with new and old sections; In the case of dynamic load structure, the plastic zone is difficult to form, without considering the redistribution of stress, the situation before and after reinforcement is calculated separately, and then the sum is calculated.


The above problems do not exist when strengthening under unloading. Under the unloading condition, the section checking calculation shall be based on the total section after reinforcement, and the reinforcement reduction coefficient shall be considered. It shall be calculated according to the current standard, that is, according to the static load checking formula of the reinforcement section effect under the load condition. The same is true for the bar frame members and beams.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 智能照明模块,智能动力控制器,巨川电气-智能电气领航 | 义乌供需网-义乌外发加工来料加工,义乌采购信息供求对接平台(yiwugongxu.com) | 长沙网站建设,网站设计制作,长沙小程序开发,公众号开发,长沙叶老设计 | 深圳网站建设-量身定制原创设计-专业网站建设公司【企术】 | 吉工宝-建筑工程项目精细化管理-施工现场安全管理软件 | 宿迁网站建设-宿迁做网站-宿迁网站制作-宿迁网络公司-宿迁网页设计-宿迁软件开发-宿迁新动力软件开发有限公司 | 履带吊租赁-履带吊出租-出租履带吊车-出租履带吊-吊车出租-履带吊出租公司 | 制砂机_制沙一体机_青石制沙机-华盛铭设备厂家 | 美缝剂_美缝剂加盟_瓷砖美缝剂_美缝剂厂家_填缝剂_领翔美缝剂-【官网】 | 青岛相控阵检测_无损探伤检测机构_相控阵超声检测公司-青岛发现检验技术咨询 | 廊坊装修装饰公司|家装设计选廊坊纽泽装饰_电话4000621358[本地实体] | 墙板_户外墙板_ASA共挤户外墙板-康亿家生态木业集团 | 上海升降机_导轨式升降货梯_移动铝合金升降机_上海力盏电动液压平台厂家 | 上进电缆(嘉兴)股份有限公司官网 - 光伏电缆|防火电缆|电力电缆|铝合金电缆专业生产厂家 | 智齿科技-智齿客服 | 在线客服_呼叫中心_客户联络中心方案 | 木工圆锯片,进口锯片厂家,合金锯片生产厂家,木工合金锯片,BAK(百恪)刀具有限公司 | 生活污水处理设备-地埋式污水处理设备厂家-山东梦之洁水处理设备有限公司 | 苏州探测器清洗_烟感探头清洗_感烟探测器维修清洗_火灾探测器清洗报价/价格_进口国产消防设备清洗_江苏智淼探测器清洗厂家- | 三轴伺服机械手_五轴伺服机械手_注塑机械手_东莞市浩能自动化机械有限公司 | 萍乡市信源电瓷制造有限公司--官网|萍乡市信源电瓷|萍乡电瓷厂|萍乡绝缘子-萍乡市信源电瓷制造有限公司 | 西安防静电地板_防静电地板厂家_防静电地板价格_OA网络地板_写字楼架空地板_机房墙板安装-红梅防静电地板厂家直销 | 妙手网-圆心大药房-广东圆心恒金堂医药连锁有限公司-放心的网上药店_妙手医生旗下正规网上买药平台 | 停车场设计|地下停车场规划设计|智能停车位地下车库设计施工装修|深圳创安顺停车库规划设计有限公司 | 家具板|橱柜衣柜家具板|木饰面定制|榉木胶合板|防水胶合板|胶合板厂家-佛山吉盛唐朝木业-大坂木业 | 深圳钢成培训专业从事,五轴培训,车铣复合培训,数控车床,CNC数控编程,模具编程 ,钣金机械与模具设计,powermill,mastercam,solidworks,ug,hypermill培训 | 随州网站建设_随州建站公司_随州SEO优化排名_随州网络公司-随州市金思维网络科技有限公司 | 制冷机组|地源热泵|冷水机组|磁悬浮冷水机组-山东鹏鲲空调官网 | 水热反应釜厂家_水热反应釜价格_水热合成反应釜批发-仪贝尔仪器 - 水热釜,水热反应釜,水热反应釜厂家,水热反应釜价格,水热反应釜型号,水热反应釜内衬,水热反应釜25ml,水热反应釜50ml,水热反应釜100ml,水热合成反应釜 | 伸缩机厂家-现货快递物流伸缩皮带机|装车输送机-乐清市华森自动化设备有限公司 | 直流屏|青岛直流屏|直流屏电池-世界500强艾默生直流屏标准生产厂家赛里斯能源科技有限公司 | 手术无影灯生产厂家-提供电动手术台,电动产床定制与批发-山东华辰医疗设备有限公司 | 球形钢支座,粘滞阻尼器,抗震球型钢支座,盆式橡胶支座,调谐质量阻尼器,屈曲约束支撑-衡水路泽科技 | 廊坊大地木业有限公司| 青州东威机械有限公司,洗沙机,脱水筛、细沙回收机,淘金设备,洗石机,砂石分离机,筛沙机,采沙船,清淤船,破碎制砂机,海沙淡化设备 | 太阳能路灯-庭院灯-太阳能灯生产厂家-北京日月升太阳能科技公司 太阳能路灯生产厂家-郑州太阳能高杆灯价格-道路照明智能路灯-河南坤德照明 | 吉工宝-建筑工程项目精细化管理-施工现场安全管理软件 | 河北高新技术企业认定,沧州商标注册,沧州9001质量管理体系认证,沧州高新技术企业认定,沧州体系认证,沧州商标续展,沧州版权登记,河北国瑞企业管理咨询有限公司 | 爬架网@建筑爬架网@冲孔建筑爬架网片@工地冲孔建筑爬架网片@工地冲孔建筑爬架网片厂家@工地冲孔建筑爬架网片生产厂家-安平县诺德金属制品有限公司 | 深圳蓝枫印刷_画册印刷_彩页印刷_宣传册印刷_包装盒印刷_彩盒印刷厂_不干胶印刷厂 | 深圳LED显示屏厂家_室内户外LED显示屏_彩屏电子有限公司 | 上海叶拓科技有限公司|