Control of welding process elements in steel structure design engineering

Time:[2022-10-19]  Hits:1847

The steel structure planning project has extremely high strength, and better construction effect can be achieved when the plant floor is higher or the span is larger. However, many actual constructors in our country know little about the steel structure project, so they can't really grasp the welding key of the steel structure planning project, which has a certain impact on the final quality of the steel structure project. Therefore, in order to improve the construction quality of steel structure planning and construction, it is necessary to strictly control and control the welding part of the steel structure project to ensure the quality of the steel structure planning project and promote the continuous updating of the construction profession and construction skills.


1. Control of process factors


1.1 Control of pre welding preparation of steel structure planning project


Preparation before welding of steel structure planning mainly refers to groove preparation, welding equipment and cleaning of welding area.


(1) Preparation of groove: the processing of welding groove directly affects the quality of welding operation, so it should be operated strictly according to the steel structure planning process; Attention shall also be paid to the fact that the raw materials, specifications and types of the arc tab groove of the steel structure planning shall be the same as those of the base metal.


(2) Welding device: the device quality not only affects the dimensions of the steel structure planning components, but also has a certain impact on the weld formation. When welding the device, it is necessary to consider whether it is easy to weld after the device. If the device affects the normal welding of individual steel structure planning welds, it is necessary to weld this weld before installing other parts. All welding materials of the device shall match with the base metal, and the spot welding height shall not exceed 2/3 of the planned weld height of the steel structure.


(3) Cleaning of planned welding area of steel structure: oil stain, rust, dust, etc. on both sides of the joint shall be completely removed to prevent blowholes and cracks in the planned weld of steel structure.


1.2 Control of welding sequence


Selecting a reasonable welding sequence for steel structure planning can reduce the deformation degree of components and prevent the occurrence of cracks. Therefore, when selecting the welding sequence for steel structure planning, the welding seam should be in a relatively free shortening state as far as possible. The welding seam with a large shortening amount should be welded first, and then the welding seam with a small shortening amount, so as to ensure that the planned welding seam of steel structure has a large shortening freedom during welding and a small planned residual stress of steel structure occurs.


1.3 Control of welding process specification parameters


The welding process specification parameters of steel structure planning mainly include welding specification parameters, preheating temperature, post heat and hydrogen elimination treatment, post weld heat treatment, etc. The welding specification parameters are clearly specified in the process, and the steel structure planning workers should strictly follow the process. The selection of welding current and arc voltage for steel structure planning shall be emphasized. The current is too small and the arc is unstable, which is easy to cause slag inclusion, incomplete penetration and other defects; If the current is too large, undercut, air hole, welding and other defects are easy to occur, and they are added together by splashing. Long arc means high arc voltage, unstable arc burning, spatter addition, small penetration, and external air intrusion, which constitute the defects of air hole incomplete penetration.

 


The steel structure planning project is widely used in industry and public construction, and the welding process is the key process in the steel structure processing and manufacturing. Strengthening the quality control of the welding process can not only improve the quality of steel structure planning products, but also have a very important effect on the quality of the entire steel structure planning project. Based on this, this paper mainly discusses the key points of welding quality control in steel structure planning project.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 高清国产一区 | 日本免费高清在线观看播放 | 中文字幕亚洲色图 | 1024香蕉国产在线视频 | 淫片在线 | 亚综合 | 最新欧美伦禁片在线观看 | 免费大片黄手机在线观看 | 污污视频在线免费观看 | 免费精品久久久久久中文字幕 | 小视频在线观看免费播放 | 亚洲色图小说 | 日产国产欧美视频一区精品 | 天堂bt资源www在线 | 在线观看精品视频一区二区 | 性xxxxx大片免费视频 | 暖暖视频在线观看免费官网 | 久久精品国产99久久香蕉 | 日本剧情片大全免费的视频 | 羞羞影院男女午夜爽爽影视 | 一级做a爰视频免费观看2019 | 午夜成人在线视频 | 99视频国产热精品视频 | 色丁香久久| by8835免费软件 | 日批在线播放 | 四虎影院海外永久 | 欧美综合视频 | 日本一区二区高清 | 99在线国内精品自产拍 | 在线国产91| 久久精品亚洲99一区二区 | 曰本女同互慰高清在线观看 | 97视频 久久久 | 一区二区在线播放视频 | 那些年我们正年轻免费全集观看 | 99九九99九九九视频精品 | 热伊人99re久久精品最新地 | 人禽杂交视频网站在线观看 | 天天射天天搞 | 欧美日韩国产在线观看一区二区三区 |