www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Control of welding process elements in steel structure design engineering
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.huihuitaotao.cn

Control of welding process elements in steel structure design engineering

Time:[2022-10-19]  Hits:2033

The steel structure planning project has extremely high strength, and better construction effect can be achieved when the plant floor is higher or the span is larger. However, many actual constructors in our country know little about the steel structure project, so they can't really grasp the welding key of the steel structure planning project, which has a certain impact on the final quality of the steel structure project. Therefore, in order to improve the construction quality of steel structure planning and construction, it is necessary to strictly control and control the welding part of the steel structure project to ensure the quality of the steel structure planning project and promote the continuous updating of the construction profession and construction skills.


1. Control of process factors


1.1 Control of pre welding preparation of steel structure planning project


Preparation before welding of steel structure planning mainly refers to groove preparation, welding equipment and cleaning of welding area.


(1) Preparation of groove: the processing of welding groove directly affects the quality of welding operation, so it should be operated strictly according to the steel structure planning process; Attention shall also be paid to the fact that the raw materials, specifications and types of the arc tab groove of the steel structure planning shall be the same as those of the base metal.


(2) Welding device: the device quality not only affects the dimensions of the steel structure planning components, but also has a certain impact on the weld formation. When welding the device, it is necessary to consider whether it is easy to weld after the device. If the device affects the normal welding of individual steel structure planning welds, it is necessary to weld this weld before installing other parts. All welding materials of the device shall match with the base metal, and the spot welding height shall not exceed 2/3 of the planned weld height of the steel structure.


(3) Cleaning of planned welding area of steel structure: oil stain, rust, dust, etc. on both sides of the joint shall be completely removed to prevent blowholes and cracks in the planned weld of steel structure.


1.2 Control of welding sequence


Selecting a reasonable welding sequence for steel structure planning can reduce the deformation degree of components and prevent the occurrence of cracks. Therefore, when selecting the welding sequence for steel structure planning, the welding seam should be in a relatively free shortening state as far as possible. The welding seam with a large shortening amount should be welded first, and then the welding seam with a small shortening amount, so as to ensure that the planned welding seam of steel structure has a large shortening freedom during welding and a small planned residual stress of steel structure occurs.


1.3 Control of welding process specification parameters


The welding process specification parameters of steel structure planning mainly include welding specification parameters, preheating temperature, post heat and hydrogen elimination treatment, post weld heat treatment, etc. The welding specification parameters are clearly specified in the process, and the steel structure planning workers should strictly follow the process. The selection of welding current and arc voltage for steel structure planning shall be emphasized. The current is too small and the arc is unstable, which is easy to cause slag inclusion, incomplete penetration and other defects; If the current is too large, undercut, air hole, welding and other defects are easy to occur, and they are added together by splashing. Long arc means high arc voltage, unstable arc burning, spatter addition, small penetration, and external air intrusion, which constitute the defects of air hole incomplete penetration.

 


The steel structure planning project is widely used in industry and public construction, and the welding process is the key process in the steel structure processing and manufacturing. Strengthening the quality control of the welding process can not only improve the quality of steel structure planning products, but also have a very important effect on the quality of the entire steel structure planning project. Based on this, this paper mainly discusses the key points of welding quality control in steel structure planning project.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 氧化膜测厚仪-瓶壁测厚仪-QNIX菲尼克斯膜厚仪-深圳市时代之峰科技有限公司 | 食品包装膜-铝箔包装袋-食品真空包装袋定制-塑料包装袋厂家-德远塑业 | 日本国际高中_上海日本国际高中学校排名_日本国际高中留学课程_上海日语国际高中学校学费-上海工程技术大学国际多语种特色高中课程【官网】 | 旋转补偿器-专注套筒三维球形补偿器定制生产厂家-伸缩接头价格_巩义市新华丰管道设备有限公司 | 球墨井盖厂家-铸铁井盖批发-雨水篦子生产厂家-安徽含山县林头新华铸造厂 | 三次元振动研磨机|涡流光饰机|东莞市正雄研磨机械有限公司 | 全国产品维权打假真伪验证系统-石家庄市海略科技有限公司官方网站 | 有机肥设备|有机肥生产线|有机肥料生产设备|河南通达重工科技有限公司 | 长春互联网运营值选星广传媒,长春短视频运营,长春新媒体运营,长春互联网运营,长春抖音运营,吉林视频号代运营,吉林快手代运营,短视频推广公司,公众号运营,微博运营,新媒体运营 | 山东优科机械设备有限公司,养鸡设备,湿帘设备,通风降温加湿设备,山东养鸡设备,山东湿帘设备 | 三原图库 - 设计图片素材打包下载sytuku.com | 宁波搬家_宁波搬家公司_宁波搬厂_专业搬家搬厂-「宁波喜洋洋搬家公司」 | 山东长青石油液压机械有限公司-致力于石油机械设备的研发制造,提供定制服务 | 长沙物流公司|湖南货物运输公司|长沙第三方物流公司-国联物流 湖南第三方物流专家 | 童程童美少儿编程培训课程 - 上市公司缔造少儿编程专业化品牌20年 | 矿用精确定位系统,井下4G无线通讯系统,工作面集控系统,皮带保护系统-山东新云鹏电气有限公司 | 微库仑硫氯分析仪-化学发光定氮仪-X荧光硫测定仪-泰州江河仪器有限公司 | 西门子伺服电机维修_西门子变频器维修_西门子伺服驱动器维修_数控系统维修_PL维修-上海仰光电子 西克制冷官网│制冷机组冷风机冷库设备厂家-西克制冷(无锡)有限公司_西克制冷(无锡)有限公司 | 找刑事辩护律师_找深圳刑事律师多少钱★王平聚【清华博士/刑法教授】 | 土工布厂家,土工布价格,山东德旭达土工材料有限公司 | 无锡紫苹果装饰首页-高端别墅装修设计,专业别墅装饰公司 | 土工布厂家,山东土工布厂家_价格低-山东莱芜「中德利」 | 联想南京总代理-联想服务器|联想电脑笔记本代理商|联想工作站|dell服务器|HP服务器|南京IBM代理商|IBM V5000存储总包销-南京宇宽科技有限公司 | 自动_链条式_电动推杆_电动开窗器厂家_山东鑫宏玺智能科技有限公司 | 芜湖净水设备-纯水设备-无负压供水设备-不锈钢水箱-芜湖市百川给水设备有限责任公司 | 冷藏车厂家-小型冷藏车价格_4.2米冷藏车价格-程力冷藏车厂家 | 学汽修,学汽修技术,汽修培训班,汽车美容培训,汽车新能源技术培训-广州万通汽车培训学校[官方网站] | 联系我们果博东方公司福布斯客服电话 | 上海鑫迪机械有限公司 上海科蜀智能机械有限公司 | 南通众诚数控机床有限公司-液压机,剪板机,折弯机,卷板机,液压冲床,路灯杆设备专业制造商 | 转轮除湿机,转轮除湿机,恒温恒湿机厂家_合肥铂克环境设备有限公司 | 江西省屹诚建筑装饰工程有限公司| 可燃气体报警器-有毒有害气体检测仪-气体检测分析系统-宁波市高品科技有限公司 | 深圳同步带轮_东莞齿轮加工_东莞同步轮厂家-东莞东城精胜机械配件厂 | 兰州物流公司_兰州货运公司_兰州物流电话上门取货_兰州立辉物流公司 | 消泡剂_有机硅消泡剂_分散剂_流平剂_氟碳表面活性剂-上海梓意化工有限公司 | 南京包装设计公司|南京手提袋制作|彩页印刷|礼品盒设计 | 墙板_户外墙板_ASA共挤户外墙板-康亿家生态木业集团 | 惠声电子、广州市惠声电子科技有限公司、VBS、VBS惠声电子、VBS公共广播生产厂家、VBS广播功放生产厂家、VBS会议系统设备批发、VBSIP网络对讲系统厂家、VBS会议系统厂家、VBS智能中控厂家、VBS专业扩声厂家 | 银联POS机_银联微信支付宝刷卡POS机_外币POS机_移动POS机办理安装——谷骐科技 | 立式/卧式/潜水/液下/螺杆/耐磨/渣浆泵|泥浆泵|离心泵,厂家 - 河北聚盛泵业制造有限公司 |